My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00629
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:59 PM
Creation date
10/11/2006 9:51:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.850
Description
Miscellaneous Small Projects and Project Studies - MWSI
State
CO
Basin
South Platte
Date
7/5/1994
Author
Hydrosphere
Title
Phase II Plan of Study, Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Metropolitan Water Supply Investigations - Phase II Plan of Study <br />7/5/94 4:17 PM <br /> <br />Page 28 <br /> <br />10 dry year and 1-in-50 dry year supplies, disaggregated by tributary sub- <br />basin and gross sub-basin location (with respect to major return flow points). <br /> <br />Conduct a literature review with respect to policy, institutional, operational, <br />socioeconomic, environmental issues. Review and summarize the following <br />sources/author: Young, Michelson, Clark, Pinnes, HarniltonfWhittlesley, <br />Howe, MacDonnell, Quinn (MWD), CUW A. Categorize issues identified by <br />abovementioned categories as well as solutions posed. <br /> <br />Develop three generic examples with respect to interruptible supply <br />arrangements with agriculture: ditch company using direct flow rights only, a <br />storage-dorninated system, a combined direct flow-storage system. <br /> <br />Meet or discuss with a selection of cities, agricultural users, researchers and <br />State water rights administration officials to discuss issues and document <br />issues raised. <br /> <br />c) Output <br /> <br />A tabulation of gross supply potential by tributary sub-basin: South Platte <br />above Chatfield, Bear Creek, Cherry Creek, Clear Creek, South Platte <br />between Chatfield and Metro, South Platte between Metro and Big Thompson, <br />Boulder Creek, St. VrainlLeft Hand Creek, Big Thompson, Cache La Poudre, <br />Arkansas, West Slope (callable). <br /> <br />Three schematic!llly illustrated hypothetical examples with narrative discussion <br />of factual setting, description of the interruptible arrangement and discussion <br />of results/impacts. <br /> <br />A task memo report. <br /> <br />d) Sub-Task Leader: Lee Rozak/is <br /> <br />4. Sub-Task 5d: Phase II Systems Integration Summary Report <br /> <br />0) Purpose <br />To present the findings of the T AC' s ongoing brainstorming and review <br />efforts, done as a part of Task 16, as they pertain to system integration ideas <br />suitable for further study in Phase III. <br /> <br />b) Approach <br />The results of the T AC's meetings during Phase II will be compiled into a <br />summary report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.