Laserfiche WebLink
<br />Metropolitan Water Supply Investigations - Phase II Plan of Srudy <br />7/5/94 4:17 PM <br /> <br />Page 2 <br /> <br />Metropolitan Water Supply Investigations <br />Phase II Plan of Study <br />07/05/944:17 PM <br /> <br />I. INTRODUCTION <br /> <br />A. Overview <br /> <br />As originally designed, the Metropolitan Water Supply Investigation Project (the <br />Project) consists of four srudy phases: I) scoping to more specifically define srudy <br />areas aod objectives; m infonnation development to learn more about each of the <br />srudy areas in order to more specifically define options; Ill) development of <br />analytical tools and analysis of options; and IV) fonnulation and evaluation of <br />conceprual design plans. <br /> <br />This Plan of Srudy (POS) concludes the scoping phase (phase n of the Project and is <br />based upon extensive deliberations of the Technical Advisory Corruninee (T AC) and <br />its work groups. The services which Hydrosphere Resource Consultants, Inc. <br />(Hydrosphere) and its subcontractors will provide to the Colorado Water <br />Conservation Board (the Board) in carrying out Phase II of the Project are described <br />in this document. <br /> <br />The attached schematic is a flow chart depicting the four Project phases and the <br />relationships between the various compooents of this POS. <br /> <br />To assist in providing the services described in this POS, Hydrosphere has <br />assembled a Consulting Team which consists of the following subcontractors: <br /> <br />HRS Water Consultants, Inc. <br />Spronk Water Engineers, Inc. <br />Mulhern MRE, Inc. <br />ECI, Inc. <br /> <br />This POS describes the responsibilities' of the Consulting Team, the T AC, and <br />others in completing this phase of the project. It includes a description of the tasks <br />to be completed for each srudy category, the administrative framework for <br />coordinating and managing the srudy, the individuals responsible for managing the <br />tasks to be completed, a schedule for completion of Phase II and an estimate of the <br />costs associated with each task. <br />