Laserfiche WebLink
<br />VII 1. Project Status: Ongoing and on-track. ISMP samp 1 i ng results 'and <br />protocol are routinely evaluated. As a result, other sampling methods <br />such as trammel netting of backwaters have been added to the project. <br />The collection of sympatric fish information may also be added to this <br />project. <br /> <br />IX, FY 94 Budget: <br /> <br />A. <br />B. <br />C. <br /> <br />Funds Provided: <br />Funds Expended: <br />Difference: <br /> <br />$22,500 <br />$22.500 <br />o <br /> <br />X. Status of Data Submission: Data have been submitted to ISMP database <br />manager - FWS, Grand Junction. <br /> <br />XI. Signed: William R. Elmblad, December 9, 1994. <br /> <br />3 <br />