My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00608
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00608
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:52 PM
Creation date
10/11/2006 9:51:08 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
10/1/1989
Author
USDOE - WAPA
Title
Salt Lake City Area Integrated Projects - Proposed Adjustment of Firm Power Eates
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />$2.09/kW-month and an energy charge of 5.0 mills/kWh. This is equal to <br />a combined energy and capacity rate of 9.92 mills/kWh, when calculated <br />at a 58.2 percent load factor. The current Integrated Projects firm <br />power rate is the same as the last CRSP-only rate, which was in effect <br />from June 1983 through September 1987. Because RGP and Collbran are <br />very small relative to CRSP, their effect on the CRSP rate was <br />negligible when the projects were integrated. <br /> <br /> Until integration on October 1, 1987, the historic capacity and energy <br /> rates of the various projects were: <br /> Combined Rate <br /> Capacity Energy at 58.2 Percent <br /> FY Charge Charge Load Factor <br /> Project Effective ($/kW-month) (mi 11 s/kWh) (mill s/kWh) <br /> CRSP 1962 1.275 3.000 6.00 <br /> 1974 1.320 3.000 6.11 <br /> 1977 1.340 3.400 6.55 <br /> 1981 1. 655 4.000 7.89 <br /> 1983 2.090 5.000 9.92 <br /> Collbran 1963 N.A. 1/ 10.600 10.60 <br /> 1984 N.A. II 19.300 19.30 <br /> 1986 N.A. 11 21.800 21.80 <br /> RGP 1940 1.250 3.000 5.94 <br /> 1949 1. 000 4.000 6.35 <br /> 1974 1. 550 4.500 8.15 <br /> 1978 2.130 6.000 11.01 <br /> 1979 2.720 7.000 13.40 <br /> 1980 3.200 8.500 16.03 <br /> 1982 4.555 10.720 21. 44 <br /> 1983 5.740 13.500 27.01 <br /> 1985 6.545 15.425 30.83 <br /> 1987 gj 7.850 18.460 36.93 <br /> 11 Not Applicable. The Collbran Project has sold only energy <br /> throughout its history. <br /> ?,/ Effective in April 1987. <br />v. PROPOSED FIRM POWER RATE <br /> <br />Based on data available as of August 1989, an Integrated Projects PRS <br />showed that the existing rate would not provide sufficient revenues to <br />repay the costs assigned to power within the required period. <br /> <br />A revised PRS was then prepared to determine the power rates needed to <br />assure the timely payment of all revenue obligations assigned to the <br />power function. The revised PRS shows that an energy rate of <br />6.64 mills/kWh and a capacity rate of $2.82/kW-month, effective <br />October 1, 1990, would meet revenue requirements. The proposed firm <br />power rates assign the same share of total firm power cost to capacity <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.