Laserfiche WebLink
<br />l'U.'UU\1 >:>111'.1.'..1. <br />Fruitland Mesa proiect <br /> <br /> <br />~2j;ATIOB <br /> <br />The Fruitland Hesa Project is located in west- <br /><:eutral Colorado in the Gunnison River Basin of t:he <br />Upper Colorado River Basin. <br /> <br />PURPOSE <br /> <br />The project would develop unused water supplies from <br />Soap, Curecanti, and Crystal Creeks for irrigation <br />of supplemental and full service land between the <br />Black Canyon of the Gunnison National Monument and <br />the town of Crawford. Benefits would also be <br />provided for recreation, fish, and wildlife. <br /> <br />STATUS <br /> <br />The Fruitland Mesa Project ~vas authorized for can" <br />struction September 2, 1964 (Public Law 88-568) as <br />a participating project under the Colorado River <br />Storage Project Act of April 11, 1956 (Public Law <br />84-485). A Definite Plan Report was completed in <br />June 1967. Because of changes in plan, costs, and <br />benefits) the Definite Plan Report has been re- <br />vised and submitted to the Commissioner for approval. <br />The Draft Env:l.romnental Statement was filed with the <br />Council on EnviroAmental Quality September 3, 1976. <br />and the Final Environmental Statement was filed <br />March 25, 1977. I~ 1977. the President reconm~nded <br />deletion of constt'uetion funds for this project. <br />The budget author:tty for FY77 was rescinded, and <br />funds have not ~een appropriated since that time. <br /> <br />A rE'.payment contnH;t w5.th the Fruitland Mesa Water <br />Conservancy I'Iistrj.ct ~M:'.l signed ill 1969. Archaeo- <br />logical 8ul:vey~ o( the project area were conducted <br />in 1975 aud 1976. Designs for the Soap Park Access <br />Road w'ere prepared by a consulting engineering firm <br />in accordance with a contract awarded in 1976. <br /> <br />~n'" <br /> <br />Frulll(lnd <br /> <br />It.'''. <br /> <br />81 <br /> <br />.... G.v""I..... <br /> <br />-.. <br /> <br />",,,1;01 ~...., <br /> <br />-- <br /> <br />e..., <br /> <br />)!$P <br /> <br />~......,' <br /> <br />~- <br /> <br />hi."., '....ag!'.. <br />~......l' <br /> <br />..... <br />'" <br /> <br />!kt,.,.tOlI... <br /> <br />L-L...L-"---' <br />HM.t gl..,~n <br /> <br />January 1981 <br />Page I of 2 <br /> <br />PLAN <br /> <br />Project water would be obtained from Soap, Curecanti, <br />and Crystal Creeks. Regulation of project water <br />supplies would be provided at the potential Milly K. <br />Goodwin Lake formed by Soap Park Darn ou Soap Creek <br />and at the existing Gould Reservoir on Iron Creek. <br /> <br />Releases from Milly K. Good~vin Lake ~vould be conveyed <br />about 10.6 miles by the Black Mesa Conduit to the <br />head of the Fruitland Canal near Crystal Creek. <br />Along its course, the conduit would intercept natural <br />flows of Curecanti Creek. The Fruitland Canal would <br />be 18.8 miles long. It would distribute flows <br />received from the Black Mesa Conduit as well as flows <br />of Crystal Creek Diversion Dam. The canal would pro- <br />vide water to several turnouts, the six largest being <br />to: (1) Dyer Creek, a tributary of Crystal Creek, <br />for diversion from Crystal Creek downstream into the <br />Crystal Valley Ditch for irrigation of lands along <br />that stream; (2) the existing Dyer Fork Ditch for <br />irrigation of lands above Gould Reservoir; (3) the <br />Catt1emanTs Ditch for irrigation of presently <br />irrigated lands below Gould Reservoir; (4) turnout <br />to provide storage water to Gould Reservoir; (5) <br />Castle Canyon, a natural channel which would convey <br />water directly to the existing Gould Canal; and (6) <br />Poison Spririgs) a natural channel that would carry <br />flows to the lands between the Gould Canal and Poison <br />Springs Draw. Minor turnouts ,from the canal would <br />be made directly to project lands and to distribu- <br />tion laterals. Sections of the Gould Canal west <br />of Castle Canyon would be enlarged by the owners. <br />Two siphons in the canal have already been replaced <br />by the Water and Power Resources Service under a <br />construction contract. <br /> <br />N. <br /> <br />\<>\<> <br />"..o>)f\ <br /> <br />, , <br />..... <br />I <br />::':: <br /> <br />'rl":; <br />",,>;)0 .. <br />Milly K.'<{J/'( <br /><(..\'f. Goodwill ril! <br />If-- Lake r.~R-- <br />. ( <br />b CURECANTI <br />~ I! CReEK <br />"'1." l / .." k! OWENS/ON <br />IV";" O,tlM <br />" - <br />I 1'- <br />I ,.",; ,"d'-coNDuiT, ~ <br />