Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />RECErlED <br /> <br /> <br />lei;; <br />tsc <br />, <br />j \...... <br />I..;:.... <br /> <br />i :. . <br />- > <br />: ..,. . .' <br /> <br />JAN 0 5 '90 <br /> <br />FI <br />I <br />L <br />e <br /> <br /> <br />-:'Oi..CiVlUU WATiR <br />~ON8IfIVATlON <br />BOARD <br /> <br />City of Englewood <br /> <br />34110 s. Elat' Street <br />Englewood. Colorado 80110 <br /> <br />Phone (303) 761-1140 <br /> <br />January 4, 1990 <br /> <br />Mr. Randy Seaholm . <br />Senior Water Resource Specialist <br />Colorado Water Conservation Board <br />1313 Sherman st., Room 721 <br />Denver, CO 80203 <br /> <br />Dear Randy: <br /> <br />This correspondence is in response to the request of the city of <br />Englewood to provide information on the storable inflow and <br />releases for the Bear Creek Reservoir for the development of the <br />Bear Creek Reservoir Operations Study. The information requested <br />was the sources of water which will be used to fill its portion <br />of the allocated storage pool and develop a proposed schedule for <br />the filling and release of water in the reservoir. <br /> <br />At this time, Englewood does not have any storage rights decreed <br />for the Bear Creek Reservoir. Englewood presently has storage <br />water rights which could be used to provide the inflows for its <br />portion of storage pool, and is presently developing additional <br />storable water rights including the McBroom Ditch Transfer. <br />However, the physical facilities and/or the exchanges necessary <br />to physically get this water to the Bear Creek Reservoir have not <br />yet bean fully developed. The:-efora, the sou:-ces of t.~e inflo';ls <br />~annot be precisely quantified at this time. However, it is <br />anticipated that the filling of the Englewood portion of the <br />reservoir will take place during April and June during the year <br />and releases will take place between July and October. The <br />attached table summarizes the tentative schedule for reservoir <br />operation. <br /> <br />If you have any questions or require additional information, <br />please feel free to contact me. <br /> <br />Sincerely, <br /> <br />yU!- .t,,- <br />stewJ* ~ <br />Director of utilities <br />City of Englewood <br />