My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00555
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:33 PM
Creation date
10/11/2006 9:49:39 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1978
Author
USDOI
Title
22nd Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />MarluraClu!lrlgdra",p,Pl' <br /> <br />Central Utah Project. Utah <br /> <br />Bonneville Unit. The contractor con. <br />tinued cleanup work on Currant Creek <br />Dam. <br />Construction continued on Vat Tunnel; <br />the boring machine excavated 27.230 feet <br />of material bringing the tunnel to 63 per- <br />cent completion. <br />Rock Creek Road was completed in May_ <br />Stillwater Tunnel reached 55 percent <br />completion. with 8.116 feet of material <br />excavated during FY78. <br />A contract was awarded in July lor place- <br />ment of riprap at Soldier Creek Dam; the <br />contract was 46 percent complele by <br />September 30, 1978. In August, contracts <br />were awarded for the Alpine Aqueduct, <br />Section 1, ollhe Jordan Aqueduct <br />System, and the Tabiona Field Station. <br />Work on these contracts began in late <br />September. <br />Bids were opened for buildings and <br />utilities for the Currant Creek Recreation <br />Area in September: an award will be <br />made in FY79. <br /> <br />Jensen Unit. The outlet works tunnel <br />lining lor Red Fleet Dam was completed <br />in April. Although outside operations <br />were shut down lor winter between <br />February and April, work on the dam was <br />about 56 percent complete at the end 01 <br />the liscal year. <br /> <br />Vernal Unit, Work began on the Block 4 <br />drains in FY78. The work was 96 percent <br />complete at the end 01 the year. <br />4 <br /> <br /> <br />O,,'I,"g 0" Jor~" Aqueducl SyStem <br /> <br />Construction Costs, Annual and Accumulated <br /> <br /> Annual Accumulated <br />Fiscal year 1968 $51,785.180 <br />As of 6130168 $771,955,084 <br />Fiscal year 1969 44,128,461 <br />As 01 6130169 816.083.545 <br />Fiscal year 1970 38,517,800 <br />As of 6130170 854.601,345 <br />Fiscal year 1971 30.443.914 <br />As of 6130171 885,045.259 <br />Fiscal year 1972 43,187,756 <br />As of 6130172 928.233,015 <br />Fiscal year 1973 46,588.918 <br />As of 6130173 974.821,933 <br />Fiscal year 1974 36.986.459 <br />As 01 6/30174 1,011.808.392 <br />Fiscal year 1975 52.303,718 <br />AS of 6J3Ol75 1,064.112.110 <br />Fiscal year 1976 70,281,741 <br />As 01 6130176 1,134,393.851 <br />Transitional quarter and <br />fiscal year 1977 .131.750.705 <br />As of 9130177 "1,266,144.556 <br />Fiscal year 1978 89JlO1,375 <br />As of 9130178 1,355.145,931 <br />'l"':I_"at'~'I~q.....,.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.