Laserfiche WebLink
<br />" <br /> <br />1242 <br /> <br />-6- <br /> <br />" <br /> <br />In maintaininG the above ram.lllum standaI'c1s, the project diversions s~all be <br />re(,'lllated, so far as is practicable, in SUCil a r.\anner that the Horth Fork, the <br />fryingpan ;iiver, aCod each of the tribut,u'ies of those streams, shall contribute <br />to the residual strew] flm"s required by those minimum standards quantities of <br />ITater in proportion to their nat'Jral contributions. <br /> <br />. <br /> <br />10. An appropriate vrritten contract shall be made 1'1hereby the Twin Lakes <br />Reservoir and Canal Company shall refrain .from diverting water whenever the <br />,,.,atural flO'iT of the Roaring Fork ,(iver and its tributaries shall be onlj' <br />sufficient to lIIaintain a flow equal to or less than that required to maintain the <br />recommended averace flows in the Roaring Fork River at the head of the proposed <br />AS1:;en Reservoir in a quantity proportionate to the respective natural contribu- <br />tions of those streaJilS from which diversions are made to the natural flm'T of the <br />Roaring Fork River. The recommended average flm,s above mentioned are flows <br />in quantities equal to those recommended as a minimum at the head of the Aspen <br />Heservoir according to the followi ng schedule submitted by the United 3tates <br />. rtsh and VIildlife-Sel'vice~and theColorado='Gariie=and 'Fish Commission: <br /> <br />~- <br /> <br />-=-----=-:...--- <br /> <br />ifonth <br /> <br />, Av:erage <br />~ Second-feet, <br /> <br />,~Acre-feet'_" __" <br />(1;000)- <br />. --- - - <br /> <br />--' <br />- -------- --- <br /> <br />__4__~___ <br />---- - <br /> <br />October <br />November" <br />L'ecember <br />January <br /> <br />44 <br />35 <br />29 <br />26 <br /> <br />2.7 <br />2.1 <br />1.8 <br />1.6 <br /> <br />February <br />~ -arch <br />ilpril <br />Lay <br /> <br />25 <br />24 <br />64 <br />100 <br /> <br />1.4 <br />1.5 <br />3.8 <br />6.2 <br /> <br />f, <br /> <br />June <br />July <br />August <br />September <br /> <br />120 <br />100 <br />63 <br />44 <br /> <br />Total <br /> <br />7.1 <br />6.2 <br />3.9 <br />2.6 <br />40.9. <br /> <br />In m3.,int2,ini'1g the above averages, at no time shall the flovT be reduced <br />below 15 c.f.s. during the months of August to April, inclusive, or belmv 60 <br />c.f.s. during the months of May to July, inclusive, providing the natural flmv <br />durin~ said period is not less than these amounts. The obligation to supply <br />the minimum stream flow as set forth in the above table on the' Roaring Fork <br />J'dver shall, to the extent of 3,000 acre-feet annually, be a project obligation <br />to 'be supplied f:'om any ~;"ters divert"d from the south tributaries of Hunter <br />Creek, Lime Creek, Last Chance Cr"",~, U __ ?::J.'f 0f thAm. <br /> <br />------------ <br />. <br />