Laserfiche WebLink
<br />. <br /> <br />" r.,j ,', <br />14"1<'-' <br /> <br />-4- <br /> <br />0, <br /> <br />3. The cost of construction and I'erpetual operation and maintenance of <br />the Aspen aeservoir shall be a charge against the project and shall be paid <br />from project revenues or as otherwise provided by the Congress of the United <br />States. <br /> <br />. <br /> <br />4. The Aspen Reservoir shall be completed before any water is diverted <br />to Eastern Colorado by means of the project. <br /> <br />5. The primary purpose of Aspen Reservoir is to furnish, in like manner <br />2,8 if the project were constructed b,' a water conservancy district organized <br />~u~suant to the laws of the State of Colorado, the water required for the pro- <br />j,e(',~ion of vies tern Colorado water users by the provisions of Section 1, Chapter <br />l72, Colorado SeSSion Laws, 1943, reading as follows: "provided, however, that <br />any l'lorks or facilities planned and designed for the exportation of water from <br />t.he natural basin of the Colorado mver a,ld its tributaries in Colorado, by any <br />district created under this chapter, shaU be subject~,to ,th~pl'o.vi?ions ofth~~="""-,, <br />_, ,_ __ . ':"lor:ado, rdvel', Compact~?,nd~t.he- Boulder-CanY,()n-'Froj~CAc~:':atlel'\<:ledi ,that anj~~ <br />o ",cil Ol'iOr],s-or' faciliti:es-:sl1a;U"obe:de'sl,Giie~f':':conEtructed=an'd~opei'ated=ofn= sucb a ~' " <br />:=-.::;- --=- - - nlnnner~-fnat -the~--i)f~serrt:-. ~prrqp..ii~ tl~n~ _~ ~ _VIa t_~r ,--and--~ in~~Jd!-f~on=:the~re:to.: __ - -=:::-:-_ :~~:- ' <br />-- ' -- pl'osRe'ctije'us'es, of .1':ater~TQ:.i':iz:rigationcand-other--benef,icial=;Con'Siiif.R.t'i:v:e:fuse~::::_' <br />=-: , ':::'~_purpos~~;:;i.ncludli11;-::consUJ:lpti vec,uses ',for-cbl::estic', . ,":;'l1il1G':a,nl:l~inaus:tria:l-:-,pur- =--'' _ <br />=:-::-__::~:"po3es, ,",'itn,in-the :natural basin- or-the' C'olorado -il.iver in the State 'of COlorad,,-,--' <br />from which ''later is exported, r.'ill not be i:opc.ired nOl' increased in cost at the <br />expense of the "rater users "rithin the sdcl natEral basin; and that the facilities <br />and other Means for the accomplishment of said purpose shall be incorporated in, <br />and made a part of, any project plans for the exportation of water from said <br />natural basin ::n Colorado." <br /> <br />o <br /> <br />" <br /> <br />6. The replacement capacity of the Aspen Reservoir is that portion of <br />the total reservoir capacity required to protect existing rights to the use of <br />water in Western Colorado for domestic, irrigation, and manufacturing purposes <br />(inclUding pm1er generation) and hereafter acquired rights to the use of water <br />j,n Western Colorado for domestic, irrigation, and manufacturing purposes <br />(excluding power generation) against alY and all losses of needed water because <br />of stream depletions resulting from project operations. In the determination <br />of such replacement capacity, consideration shall be given to, but not neces- <br />sarily limited to, needs for water for the following purposes, such needs, how- <br />ever, not to be for quantities in excess of those qu~tities of water which <br />"'0 uld have been available from the Roaring Fork Hiver to supply such needs if <br />the project had not been constructed: <br /> <br />" <br /> <br />(a) To supply existing rights belaer Aspen Reservoir; <br /> <br />(b) To irrigate new land and provide for supplemental irri- <br />gation in 'Jestern Colorado j <br /> <br />(c) To satisfy the obligation of the ,0arin~ Fork River to con- <br />tribute its proportional sha,"e of the required '.'.'inter flows at a <br />_ _' ____ p.Qint _immedia tely-l:Jel(7il-t he-c orrfluence' 'of-t;;Je[loariiijfF or k River <br />and the Colorado :liver; and <br />