My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00551
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:12:36 AM
Creation date
10/11/2006 9:49:35 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Gunnison-Arkansas Project
State
CO
Water Division
4
Date
2/27/1951
Author
CWCB
Title
Report of Policy and Review Committee with Proposed Principles of Operation - Appendix A
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..... ..., ~ (. <br />.1,1..1v <br /> <br />The_C,ommittee_I'ecognized_that_the_finaLamount_of_wat,er to be <br /> <br />., <br /> <br />.' <br /> <br />- - - <br />---- <br /> <br />-----~-- <br />----- ---- - <br />, ' , <br /> <br />i <br /> <br />'j' <br /> <br />allocated to municipal purposes cannot be determined in advance of the <br /> <br />project authorization and the negotiation of appropriate contracts v~th <br /> <br />various municipalities involved. However, the Committee does recommend <br /> <br />that as much water as possible consistent with the economic feasibility <br /> <br />of the project should be earmarked for present and future domestic and <br /> <br />municipal supplies and purposes. The Committee agrees that the suggested <br /> <br />figure for municipal purposes of 17,000 acre-feet (including 2,000 acre- <br /> <br />feet of Wurtz Ditch water for Pueblo) shown in the special report of <br /> <br />September 19u9 is more clearly representative of a proper allocation to <br /> <br />__ u____ <br />- --- --------- --- <br /> <br />- ---- <br />------. <br /> <br />.-------......:.-- <br /> <br />mtifiicipai,:':pUr,\loses'f6r,c{mmediate cneedEthattA.he 5 ,700.:':acr.e,..feet csh:own",in= =,,'_ " <br />--- ----------- ------- -.--.,----- - ---, ------ ---- <br /> <br />, -' <br />the ,'i9l!8',drarLof report., <br /> <br />-----. <br />, , , <br />, , <br /> <br />-.---- -- <br />-~--- <br /> <br />Following discus5ionl5f'the-inclusion~in-the'projec~ of-a central' <br /> <br />water treatment plant for municipal water and a valley pipe line to convey <br /> <br />municipal water to the Valley tOV/llS, the Committee agrees that the Bureau <br /> <br />of Reclamation should contemplate construction of water treatment plants <br /> <br />as part of the project, and the Committee is in agreement that the valley <br /> <br />pipe line and water treatment plant to convey municipal water to the various <br /> <br />Valley towns should be included as part of the project works with the cost <br /> <br />of such pipe line to be allocated to municipal purposes. <br /> <br />Provision of Replacement Reservoir <br /> <br />The Committee is in agreement that replacement storage should be <br /> <br />'" <br /> <br />provided at the Aspen Reservoir site located on the Roaring Fork about one <br /> <br />mile upstream from Aspen. Studies by the Engineerin~ Advisory ~l1"ccmmit~." <br /> <br />as presented in its report dated July 16, 19u9, ~nd made e part ~f the <br />
The URL can be used to link to this page
Your browser does not support the video tag.