My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00533
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:12:32 AM
Creation date
10/11/2006 9:49:25 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
9/14/1966
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />'001704 <br /> <br />. <br /> <br />. <br /> <br />Topographic maps for the conduit on the Basalt Project have been <br /> <br />received from the contractor. The mapping was accomplished with funds <br /> <br />made available by the State of Colorado. The current FY 1967 program <br /> <br />will include an additional $10,000 contribution by the State. These <br /> <br />funds will enable land classification work to be started this fiscal <br /> <br />year instead of in Fr 1969 as previously programed. <br />\of ADVANCE PLANNING <br /> <br />Advance planning on the Fruitland Mesa Project is receiving pri- <br /> <br />ority to permit completion of a definite plan report in December 1966. <br /> <br />As a Tesult of recent field inspection and geologic exploration, the <br /> <br />inlet location for the Black Mesa tunnel has been moved about 1,000 feet <br /> <br />downstream. The diversion site on Curecanti Creek may also be moved down- <br /> <br />stream below Commissary Gulch in order to improve the project water supply. <br /> <br />Some foundation drilling for specification. design at Soap Park Damsite <br /> <br />has been done but funds are insufficient this fiscal year to complete <br /> <br />all of the drilling program desired by the Chief Engineer. Water supply <br /> <br />studies are currently being revised to determine whether Some adjustment <br /> <br />in project acreage or project plan will be necessary. <br /> <br />Land classification anfi drainage studies on the Savery-Pot Hook <br /> <br />Project are continuing. Field work for land classification and drainage <br /> <br />has been completed in the Two Bar area of the project. Land classifica- <br /> <br />tion field parties have been working for several months in the vicinity <br /> <br />of Baggs, wyoming. Our program in the Pot H80k and Savery Canal service <br /> <br />areas is to update the previous land classification and to obtain a better <br /> <br />correlation between the land classification sampling and soil drainage <br /> <br />characteristics. This latter evaluation involves deep hole borings to <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.