Laserfiche WebLink
<br />National Environmental Policy <br />Act Activities <br /> <br /> <br />r <br /> <br />M- <br /> <br />, <br /> <br />-. <br /> <br />YOu"" ",~"''''"''.'' ~"H.t. " H. <br /> <br />No En'monmental Statements were com. <br />pleted. but those being prepared for the <br />lower Gunnison Basm Umt and the <br />Dominguez Project are on schedule. Also. <br />seven Environmental Assessments. seven <br />Findings of No Slgnlflcanllmpacl. and 62 <br />Categorical ExcluSions were prepared. <br /> <br />Work is continuing on the Implementation <br />01 the Instream Flow Agreement for the <br />Strawberry Collection System whIch was <br />signed In February 1980. <br /> <br />Significant basehne environmental <br />studies continued at Utah lake for the <br />proposed Irrigation and Drainage System <br />ot the Bonneville Unit. Other hsh and <br />wildiile baseline inventories were con- <br />ducted at CASP partlcipatlng projects. <br /> <br />The Colorado River FIshery Program 10 <br />determine habitat reqUirements 01 the <br />endangered Colorado RI'..er Squawllsh, <br />humpback chub. and t>onytaiJ chub con- <br />tinued through liscal year 1980. <br /> <br />8 <br /> <br /> <br /> <br />-,,_,;' r . '" ...,'I'~,- ""t'Ll ...dt. <br />