My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00436
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:02 PM
Creation date
10/11/2006 9:45:53 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.A
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
3/1/1977
Title
Dolores Project-Colorado - March 1977
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />it would improve the streamflov in the summer and fall <br /> <br />by reservoir releases made specifically for minimum flows. <br /> <br />These flows would improve the stream for fish, wildlife, <br /> <br />and recreation (other than white-water boating). The <br /> <br />project would also provide minimum basic facilties for <br /> <br />recreational use at five locations on the river, and these <br /> <br />facilities were recognized in the wild and scenic river study <br /> <br />as being necessary for the good use of the river if it <br /> <br />became part of the system. <br /> <br />Safety <br />There are no credible question regarding safety of <br /> <br />project features. Investigations for feasibility <br /> <br />estimates have demonstrated geologicaly sound foundation <br /> <br />and construction materials. Final engineering designs <br /> <br />have not yet been completed. These designs are proceeding <br /> <br />in accordance with the best engineering practices. Upon <br /> <br />completion an independent review of principal structures <br /> <br />will be conducted in conformance with recently formulated <br /> <br />Reclamation policy. <br />D. Institutional <br /> <br />1. Identification of beneficiaries, including for direct beneficiaries <br /> <br />estimated number of individuals, farms where available and <br /> <br />identification of all beneficiaries receiving over 5 percent <br /> <br />of direct project benefits. <br /> <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.