My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00420
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:56 PM
Creation date
10/11/2006 9:44:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.600.20
Description
CBT Title Transfer to NCWCD
State
CO
Basin
South Platte
Date
10/1/2000
Author
USDOI/BOR
Title
Draft Environmental Assessment - Title Transfer of Selected Colorado-Big Thompson Project Water Facilitiies to the Northern Colorado Water Conservancy District
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ENVIRONMENTAL ASSESSMENT <br />nTLE TRANSFER OF SELECTED COLORADO-BIG THOMPSON PROJECT WATER <br />FACILITIES TO THE NORTHERN COLORADO WATER CONSERVANCY DISTRICT <br /> <br />capacity of] ,500 cfs, The surface area covered by the easement associated with the canal <br />is ] 67.88 acres with an average width of ] 50 feet ]n addition to providing for the <br />delivery of supplementary water to the Poudre Valley, the canal provides for the <br />replacement of water diverted into the North Poudre Supply Canal. The main canal is <br />composed of unlined and concrete-lined trapezoidal sections, a rating section with <br />gauging station, four siphons, chute and outlet stilling basin. <br /> <br />Windsor Extension <br /> <br />The Windsor Extension begins at the bifurcation works on the Charles Hansen Supply <br /> <br /> <br />Canal and extends north, crossing the river, to the Windsor Canal and Reservoir <br /> <br />Company Canal, which diverts from the river above the point where project deliveries are <br /> <br />made. The Windsor Extension is V, mile long and has a design capacity of250 cfs. It is <br /> <br /> <br />made up of an inlet control works, concrete-lined trapezoidal section, Parshall flwne and <br /> <br /> <br />gauging station, bench flwne, the Poudre River Siphon, and an outlet control works. The <br /> <br />width of the easement above the Poudre River siphon is about ] 50 feet <br /> <br />North Poudre Supply Canal <br />The North Poudre Supply Canal leads from the Cache la Poudre River at a point <br />about I mile above its confluence with the North Fork and extends northeast about 12.85 <br />miles to a junction with the North Poudre Ditch at a point located about 12 miles <br />northwest of Fort Collins. The area covered by the easements associated with the canal is <br />359.7 acres, with a typical width of 100 to 110 feet The canal passes through four <br />tunnels. The width of the easements above the tunnels is typically 12.5 to ] 5 feet. The <br />canal is designed to divert and transport water from the river to supplement irrigation <br />supplies taken from the North Fork by the North Poudre Ditch. Water diverted via the <br />supply canal may be replaced in the river about 6 miles below the diversion point by <br />water release from Horsetooth Reservoir via the Charles Hansen Supply Canal. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.