My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00416
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:54 PM
Creation date
10/11/2006 9:44:27 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
12/22/1997
Author
UCRBRIP
Title
1997 Annual Reports Package Part 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />IV. Study Schedule: <br /> <br />Project started in 1993 and it is anticipated that the completion date will be sometime in <br />1999. The project for Phase 3 is approximately 2 months behind schedule due to changes <br />in personnel and additional tasks, but should be completed by the end of January, 1998. <br /> <br />V. Relationship to RIPRAP: <br /> <br />This project will assess the legal and physical availability of water and compact <br />considerations for the Yampa River above and below the Little Snake River, Little Snake <br />River, White River, Colorado River (mainstem), Gunnison River, Dolores River and the <br />San Juan River. The data will be used in appropriating instream flows. <br /> <br />VI. Accomplishments ofFY 97 Tasks and Deliverables: <br /> <br />For FY 97, the CROSS Project River Basin Models will be completed by January 1998. <br />The database to run these models is online and has been fully populated will data ranging <br />from structures diversion, climate data to water rights infonnation <br /> <br />VIT. Recommendations: <br /> <br />It is being recommended that the study period of the water resource planning model be <br />extended to include a longer hydrology period. <br /> <br />VllI. Project Status: <br /> <br />The project for Phase 3 is approximately 2 months behind schedule but should be <br />completed by the end ofJanuary, 1998. <br /> <br />IX. FY 97 Budget <br /> <br />Funds Provided: <br />Funds Expended: <br />Difference: <br /> <br />$ 495,200 <br />$ 495 200 <br />$ 0 <br /> <br />X. Status of Data Submission: N/A <br /> <br />XI. Signed: ~ Alvarado <br />Principal Investigator <br /> <br />12/1 1/97 <br />Date <br /> <br />W:'LJCRB\REPOR.'T'S\UP1'S9NX)11CAJ'1 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.