My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00390
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:47 PM
Creation date
10/11/2006 9:42:42 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8277.500.20
Description
Uinta Basin Unit - Colorado River Water Quality Improvement Program
State
UT
Basin
Colorado Mainstem
Date
7/1/1981
Title
Uinta Basin Unit Status Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... <br />.... <br /> <br />C:J <br />f"-' <br />--' <br /> <br />c' <br />~ <br />..">. <br />~ <br /> <br />The following table summarizes the estimated salinity concentration reductions, the number of evalu- <br />ation units where improvements would be made, and the estimated costs of the two options for both an <br />incremental plan formulation analysis and a cumulative plan formulation analysis. <br /> <br />Option 1 <br />(use of saved water) <br />Incrementa} Cumulativi <br />analysis! analysi~ <br /> <br />Effects on the Colorado River (average annual) <br />Reduction in salinity concentration at <br />Imperial Dam <br />Project features <br />Number of evaluatjon units studied for <br />improvement <br />Estimated costs (unit--$l,OOO) <br />Canal snd lateral lining <br />Interest during construction <br />Total <br />Anoual equivalent cost for 50 years at <br />7 3/8 percent interest <br />Operation, maintenance, and replacement <br />costs <br />Total annual cost <br />Average cost per mg/L of salinity con- <br />centrat ion reduction at Imperial Dam 569.40 962.00 <br />1/ Reaches of canals were included in this plan if individually they <br />than $1.0 million per mg/L reduction in concentration at Imperial Dam. <br />2/ Reaches of canals were included in this plan as long as the total <br />was equal to or less than $1.0 million per mg/L reduction at Imperial Dam. <br /> <br />3.94 <br /> <br />6.07 <br /> <br />8 <br /> <br />16 <br /> <br />26,968 <br />994 <br />27,962 <br /> <br />70,900 <br />2,528 <br />73,428 <br /> <br />2,122.30 <br /> <br />5,577.60 <br /> <br />121. 20 <br />2,243.50 <br /> <br />267.00 <br />5,844.60 <br /> <br />Option 2 <br />(nonuse of saved water) <br />Incrementa} Cumulativj <br />analvsis1 analvsi~ <br /> <br /> 7.33 9.58 <br /> 11 19 <br />45,790 85,864 <br /> 1,688 3,130 <br />47,478 88,994 <br /> 3,603.50 6,754.60 <br /> 192.80 342.40 <br /> 3,796.30 7,097.00 <br /> 517 . 90 740.80 <br />had a cost equal to or less <br />average cost for the plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.