Laserfiche WebLink
<br />-l7- <br /> <br />o <br />o <br />() <br />C":'l <br />CD <br />OJ <br /> <br />is graphioally shown on Drawing No. 91742. It may be noted that without <br /> <br />Granby reservoir during the winter period tunnel diversions would be <br /> <br />negligible, averaging probably less than 20 seoond feet. The total firm <br /> <br />emrgy that oan be generated, with tIs reservoir in operation is estimated <br /> <br />at about 480,000,000 kilowatt-hours per annum. Without tl'B reservoir it <br /> <br />is estimated at about 24,()()()",000 kil~att-hours per annum, or a reduction <br /> <br />of e.bout 456,000,000 kil~att hours per J"ar. This indioates the neoessity <br /> <br />of having Granby reservoir in operation when the tunnel goes into oper. <br /> <br />ation. <br /> <br />The attaohed diagrame indioate what appears to be a logiaal <br /> <br />oonstruotion sehedu1e to insure the operation of the major pOl'03r plants <br /> <br />by the sUlllller of 1944 and the operation of all plants by the SUJ1Jller of <br /> <br />1945. The dates of oommenoement of the essential features are shown on <br /> <br />tl'B diagram, togetlBr with the dates of canpletion. The amounts of funds <br /> <br />neoessary are shown on the 10l'03r portion of the diagram. Tl'B following <br /> <br />table shows the amounts of funds required in acoordanoe with the above <br /> <br />suggested sohedule! <br /> <br />For pov.er <br />Features Only <br /> <br />For Power and <br />Irrigation Features <br /> <br />Total appropriations and <br />allotments to June 30, 1942 <br />Required for fisoal year 1943 <br />Required for fisoal year 1944 <br />Require d for fisoal year 1945 <br /> <br />$11 ,050,000 <br />18,055,000 <br />15,090,000 <br />3 .6r1o ,000 <br /> <br />$47,861.000 <br /> <br />$11,050,000 <br />24,005,000 <br />23,059,000 <br />6,876,000 <br /> <br />$65,000,000 <br />