My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00383
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:44 PM
Creation date
10/11/2006 9:42:35 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.100
Description
Colorado Big Thompson Project - Project Description
State
CO
Basin
South Platte
Water Division
1
Date
1/5/1942
Author
RJ Tipton
Title
Analysis of Power Features of Colorado-Big Thompson Project with Recommended Construction Schedule
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />II <br /> '" <br />: <br /> I <br /> <br />m <br /> <br />1II111 <br /> <br />J~MA~JJA50NDJFM'WJJ.SO"OJF.'MJJ.SONDJFMAMJJ'SONOJFM'MJJ'SO~OJFM'MJJ'50NOJFM'MJJ~SOND <br /> <br />1939 <br /> <br />1940 <br /> <br />1942 <br /> <br />1944 <br /> <br />1945 <br /> <br />1941 <br /> <br />1943 <br /> <br />SUGGESTED CONSTRUCTION SCHEDULE <br /> <br />JF~AMJJA50~OJ'M'NJJ'SO"DJF.'.JJ'~ONOJf.'.J J.' DNa J F....IlIJ J"', OliO J F..IIJ JA50ND JF ....IIIIJ JA'OllD <br />1939 1940 1941 1942 1943 1944 1945 <br /> <br />$ 60,000,000 <br /> <br />::'0,000,000 <br /> <br />40,000,000 <br /> <br />30,000,000 <br /> <br />20,000,000 <br /> <br />10,000,000 <br /> <br />o <br /> <br />REQUIRED FUNDS FOR SUGGESTED CONSTRUCTION SCHEDULE <br /> <br />~6SJOO <br /> <br />Continental Divide Tunnel <br />Green Mountain Dam and Power Plant <br />Shadow Mountain Dom <br />Gronby Dam <br />Gronby. Pumping Plont and Conol <br />Power Conal No.1 and No.1 A <br />Power Plant No.1 and No I A <br />Power Conol No.2 <br />flower Plonl No 2 <br />Power Canol No.3 <br />Power Plant No. 3 <br />POll'er Conol No 4 <br />Power Plonl No 4 <br />Power Plont No.4 A <br />Horsetooth Dam <br />HOrsBtooth Supply Canol <br />Pbudr. .~upply Conol <br />Corter Loke Dam <br />. Corter LoIIe Supply Conol <br />Arkln$ Res. or Equlv, Eosl Slope Storoge <br />AIkins ReserVOIr Inlet Conal <br />'Tran,min.on lin., and Sub. Sto <br />. Roods, Buildings, etc. <br /> <br />COLORADO WATER CONSERVATION BOARO <br />CLIFFORD H. STONE, DIrector C. L.PATTERSON, Chief EngIneer <br />R J TIPTON, Con~utljng Engineer <br /> <br />COLORADO - BIG THOMPSON PROJECT <br />SUGGESTED <br />CONSTRUCTION SCHEDULE <br /> <br />POWER AND IRRIGATION FEATURES <br /> <br />December 1941 <br /> <br />CHART No.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.