My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00383
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:44 PM
Creation date
10/11/2006 9:42:35 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.100
Description
Colorado Big Thompson Project - Project Description
State
CO
Basin
South Platte
Water Division
1
Date
1/5/1942
Author
RJ Tipton
Title
Analysis of Power Features of Colorado-Big Thompson Project with Recommended Construction Schedule
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-13- <br /> <br />'-' <br /> <br />c:' United States (pov.er)I <br />c:J <br />0::; Power Plant No. 5 <br />Power Plant No. 1 <br />Power Plent No. 2 <br />Power Cenal No. 2 <br />Power Plant No. 3 <br />Power Canals No. 3 and No. 3A <br />Power Plant No. 4 <br />Power Canal No. 4 <br />POwer Plant No. 4ft <br />Tran~ission lines exoept the one between <br />Power Plant No. 1 and the Granby <br />Pumping Plant. <br /> <br />The contraot provides that the cost of operating and maintain- <br /> <br />ing the following works shall be borne by the Di stricti <br /> <br />North Poudre Supply Canal <br />North Poudre Pumpin~ Plant, and <br />The st. Vrain Conduits. <br /> <br />The contract provides that the cost of operati ng and maintain- <br /> <br />ing all other works, not listed aboV'e, shall be borne equally by the <br /> <br />United States and the District. The annual operation end maintenalllle <br /> <br />cost of these features is estimated at $140,000. Too amount chargeable <br /> <br />to power is $70,000 per annum. <br /> <br />Annual operation and maintenanoe of the Fower features is <br /> <br />estimated at $410,000. The details of operation and maintenance esti- <br /> <br />mates are given in Table No. 7 of the Ap?'lndix. <br /> <br />Too total cost of the depreaiable items of the power features <br /> <br />is e stirnated to be $11,953,000. The detai Is of these estimates are giV'en <br /> <br />in Table No. 8 of the Appendix. It is assumed that these depreciable <br /> <br />items will have a life of 30 years. A sinking fund is assumed to be <br /> <br />set up far 30 years at 3%. On this basis the aV'erage annual depreoia- <br /> <br />tian ohargeable to power is estimated at $251,000, <br />
The URL can be used to link to this page
Your browser does not support the video tag.