Laserfiche WebLink
<br />., <br /> <br />-12- <br /> <br />C:.1 <br />C'-' <br />(.~ <br />c:) <br />....1 the tu.nnel. nowever, in such a period as 1902 to 19i~1, periods of low <br /> <br />"",tel' supply would lirrdt firm energy gereration to about 1~80.000.000 <br /> <br />kilowatt-hours per annum without aid from steam plants, and to about <br /> <br />720,000.000 kiiClo'lfltt-hours per annum if existin" off-peak steam oapaoi- <br /> <br />ty is used for firming projeot energy. ,Therefore, "oM proj"ct oan be <br /> <br />operated as outlined in this report wi,th01.1t violating the provision of <br /> <br />the 0 antraot quoted on page 8. <br /> <br />COST OF GElJE1V\TING JiliD DEUVERING <br />ELECTRICAL ElffiRGY FROM PROJECT <br /> <br />The oost of generating and delivering energy from too project <br /> <br />is made t:.p of the following; items. <br /> <br />1. <br /> <br />Annual repll.yrnent and int,erest ,on t~t portion of the pro~ject <br /> <br />allooatod to powar. <br /> <br />2. <br /> <br />One-half the o.nnual operation o.nd maintenanoe e xpenso of' the <br /> <br />j oint features. <br /> <br />3. <br /> <br />The annual operation and maintenanoe expenso of th~ power plants <br /> <br />and pOWer canals. <br /> <br />4. <br /> <br />The annual depreoiation chargeable to po..,r. <br /> <br />The contract between the United Stlttes and the Northern Colo- <br /> <br />rado Hater Conservancy District allocates ~27.0oo.0oo of the cost of the <br /> <br />projeot to irrigation. 'roo allo,,",+;lcn to pOYler. therefor", for the pur- <br /> <br />pose of thia report is estimo.ted fit $40,000.000. A repayment period of <br /> <br />40 years at 3% interest on that portion of the project allocf'ted to power <br /> <br />is assumed. <br /> <br />The contract between the Unit",i State" and the District prov:i.dea <br /> <br />that the cost of operating the following features shall be borne by the <br />