<br />o <br />l'- <br />C\! <br /> <br />the downstream toe. <br /> <br />Qu,tlet and Diversion Works <br /> <br />The outlet works located in the left abutment provide for discharge <br /> <br />capacity of 150 second-feet with the reservoir water surface at <br /> <br />elevation 5885. Control of discharge will ~e .mad~e by means~f' two 20" N <br />A.:..dJ."1- I~ .H'-'" - .~.~ "" ~ ~., <br />segmental jet valves attached to shcft ~~ f lfw". <br /> <br />in diameter located in a 6'6" outlet tunnel. Provision is nade for <br /> <br />supplying 10 second-feet to the Davey Ditch by means of a riser pipe <br /> <br /> <br />attached to the outlet pipe of the reservoir. Diversion capacity <br /> <br />during construction of the dam for 1,000 second-feet can be nade with <br /> <br />'::-... <br /> <br />a coffer dam at elevation 5875. <br /> <br />Spillway <br /> <br />The spillway will be an open uncontrolled side channel with a <br /> <br />, <br />I <br /> <br />total overall length of about 700 feet located at the right abutment <br /> <br />of the dam. The spillway will provide for a capacity of 12,000 <br /> <br />! <br /> <br />second-feet with a head of 8 feet over crest of 150 feet. The upstream <br /> <br />portion of the channel will have a 20 foot bottom width with 1/2;1 <br /> <br />side slopes with concrete lining on the excavated rock surface. The <br /> <br />channel width is 24 feet at the cross weir which gradually increases <br /> <br />to 60 feet at the stilling basin with channel walls of varying side <br /> <br /> <br />slopes from 1/2:1 to vertical at the upper end of the stilling basin <br /> <br />and supported by buttresses and counterforts. The stilling basin is <br />a combination of spill and outlet structure with a. length of 100 feet. <br /> <br />I <br /> <br />Embankment <br /> <br />Embankment naterialscan be secured from the reservoir basin with <br /> <br />a haul of not po exceed one mile. Earth samples of materials suitable <br /> <br />J <br />