My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00377
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:41 PM
Creation date
10/11/2006 9:42:28 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.128.A
Description
Silt Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1945
Author
USDOI - BOR
Title
Silt Project-Colorado (Draft of Project Planning Report) Part 2 of 2
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />O':l <br />c..o <br />C\l <br /> <br />~ <br /> <br />The dam would be clay, sand and gravel rolled fill with maximum <br /> <br />height of 127 feet and a crest length of 800 feet. The compacted clay, <br />sand and gravel section is bound on the upstream face by 3 feet of <br />riprap from the crest elevation of 5954 down to a 20 foot berm at <br /> <br />elevation 5875. The slope from the berm is brought down on a 5 to 1 <br /> <br />scale to the ground surface. The downstream face of the dam will have <br /> <br />a rock filled cover with a slope of 2 to 1 from the crest elevation <br /> <br />of 5954 to 5855 where the slope will be 5 to 1 down to elevation 5830 <br /> <br />and then 2 to 1 to the ground surface. The downstream face of the <br /> <br />compacted earthfill (upstream face of rock fill section) is placed on <br /> <br />a slope of 1.9 to 1 beginning 5 feet in from the downstream edge of the <br />~/.. <br />crest. The main fill :b composed of an impervious center section <br /> <br />I <br /> <br />with a semi-pervious cover beneath the riprap and rock filled slope. <br /> <br />The coffer dam wpich will become an integral part of the dam is composed <br /> <br />of materials stripped from the foundation. <br /> <br />Four shallow cut-off trenches located upstream and parallel to the <br /> <br />dam axis across the canyon floor will be brought in obliquely toward <br /> <br />the crest on the abutments. The first cut-off trench is located 25 <br /> <br />" <br /> <br />feet upstream from the axis with the remaining 3 at successive intervals _.' <br />of 50 feet. The trenches will have a trapazoidal section, 10 feet <br />bottom width, and an approximate depth of 6 feet. <br /> <br />':f <br /> <br />Two feet of stripping Qver the entire area of the dam foundation <br />.~ <br />is believed sufficient to provide a surface of good ~ between the <br /> <br />foundation and the embankments. Eight and ten inch sewer pipe drains <br /> <br />embedded in gravel will be placed beneath the rock filled section along <br /> <br />1... <br />
The URL can be used to link to this page
Your browser does not support the video tag.