Laserfiche WebLink
<br />San Juan National Forest <br /> <br />Columbine Ranger District (USFS) <br /> <br />P.o. Box 439 <br /> <br />12/1/2000 NEPA U date (Duranao) (970) 247-4874 (Bav/ield) (970) 884,2512 Baytield. CO 81122 <br />Project Name Expected Project Project <br />(or Type) and Proposed Project and Contact Person Date of Decision Legal NEPA Status <br />Document Location as of <br />Map Number Availabilitv Date 12/112000 <br />TIMBER <br />Shamrock Thin ponderosa pine on 300 acres in the lower Beaver Creek area, Winter 2001 Spring 2001 T35N, R6W EA Ana/ysis in <br />Timber Sale (1) GRETCHEN FITZGERALD (Paoosa Sorinas) pronress <br />RECREATION <br />Purgatory Review of Purgatory Resort's Master Development Plan, which Awaiting <br />Resort Master describes possible construction, improvement. and upgrading of <br />Development recreation facilities within the current permitted area. Unknown Unknown T39N, R9W EIS project <br />Plan (5) RICHARD SPEEGLE (Duranao) proposal <br />Sauls Creek Trail Construct/reconstruct about 9 miles of trail in the Sauls Creek area. Initial EA Winter 2001 T34N, R6W EA Decision <br />(6) RANDY HOUTZ (Bayfield) 8/2000 oendino <br />~ Electra View Trail Construct/reconstruct a trail network near Castle Rock. MIKE Unknown Unknown T39N, R9W EA Scoping in <br />(10) JOHNSON (Bavfield) progress I <br /> Develop special winter road closures to prohibit all motorized <br /> vehicles. except snowmobiles, on portions of Haviland Lake Road T38N, R9W <br />Winter Road (#671), East Vallecito Road (#603), East Florida Road (#597). N/A Winter 2001 see 25; CE Analysis in <br />Closures (8) Middle Mtn.Road (#724). Missionary Ridge Road (#682), Beaver T36N. R6W progress <br /> Meadows Road (#135). and First Notch Road (#620). NANCY see 9,16.17.20 <br /> BERRY (Duranoo) <br />Molas Pass Develop a Winter Recreation Management Plan for the Molas Pass Initial EA T40N,R8W Decision <br />Winter Winter 2001 EA <br />Recreation (18) area, NANCY BERRY (Durango) 11/99 T41 N,R8W pending <br />Little Molas Lake Relocate Purgatory Campground along the Hwy 550 corridor. T40N,R8W Scoping in <br />Campground possibly to the Litlle Molas Lake area. RICHARD SPEEGLE Winter 2001 Spring 2001 EA <br />1(18) (Durango) sec 11-14 progress <br />Purgatory Trail Relocate Purgatory Trailhead to the Old Lime Creek Road gravel T39N, R9W Scoping in <br />and Trailhead pit area, with a trail to Purgatory Flats. RICHARD SPEEGLE Winter 2001 Spring 2001 EA <br />(11) (Durango) sec 13 progress <br />Nebo Creek Trail Construct/reconstruct about 1.8 miles of trail on the Continental N/A Winter 2001 T40N,R6W CE Scoping in <br />(9) Divide Trail. RANDY HOUTZ IBavfield) oroaress <br />Lime Mesa Trail Reconstruct about 3 miles of trail for watershed restoration. MIKE Winter 2001 Spring 2001 T38N,R8W EA Scoping in <br />(21 JOHNSON IBavfieldL- pronress <br />Junction Creek Construct v.. mile of fully accessible trail adjacent to Colorado Trail Summer T36N,R10W Awaiting <br />ADA Trail below Junction Creek Campground. RANDY HOUTZ (Bayfield) Spring 2001 2001 sec 36 EA project <br /> proposal <br />Dutch Creek Trail Conduct heavy maintenance/reconstruction on about 1 mile of trail. N/A Winter 2001 T37N,R9W CE Scoping in <br />1(22) RANDY HOUTZ (Bayfield) proaress <br />ROADS <br />Bear Creek Road Allow permanent easement across National Forestland. N/A Winter 2001 T36N, R6W CE Decision <br />Easement (12) SONJA HOlE (Pagosa Springs) pendino <br /> <br />s <br />