My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00331
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:47 PM
Creation date
10/11/2006 9:40:21 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
2/1/2001
Author
US Forest Service
Title
Nepa Project Update - San Juan National Forest and San Juan Field Office
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />San Juan National Forest <br /> <br />Mancos-Dolores Ranger District (USFS) <br /> <br />P.O. Box 210 <br /> <br />1~/1l2000 NEPA_LJpdate ,. (970) 882,7296 Dolores. CO 81323 <br />Project Name Expected Project Project <br /> Date of Legal Status <br />(or Type) and Proposed Project and Contact Person Document Decision Location NEPA as of <br />Map Number Availability Date 12/112000 <br />- <br />LANDS Exchange 20 acres of National Forest land for private land in Ice 'I I I <br /> Feasibility <br /> Analysis & <br />Morgan Parcel 0 Lake Basin and Kite Lake (adjacent to Weminuche Wilderness on N/A Sep 2001 T40N,R13W CE Agreement to <br />Exchange Rio Grande Nat'l Forest), PAUL BEABER (Durango) Initiate being <br /> prepared <br />Paquet Small Dispose of isolated remnants of National Forest land through T39N,R13W Eligibility <br />Tracts Act authority of the Small Tracts Act. PAUL BEABER (Durango) N/A Sep 2001 Tract 39 CE determination <br />Interchan~ I <br />OTHER <br /> Change tie,in of a previously approved natural gas gathering- T37N. R15W; <br />Black Resources system pipeline to TransColorado pipeline. Includes about 23 Draft EA Aug 2000 T38N. R15W; EA Project J <br />Inc, (12) miles 01 new 4'.6-. and 8,inch pipeline and a compressor station. available T39N. R14W approved <br /> Reentry of 9 old. abandoned well sites. JOHN REIDINGER T37.38N,R14W <br />Dolores Water Drill and test 3 temporary water wells in Rico area (previously 1- ~ter 2001 T40N,R11W. DeciSion <br />Conservancy approved for Town of Rico; transferred to the Dolores Water N/A see 13 CE pending <br />District Conservancy District), JOHN REIDINGER <br />Ouest Buried Installation of about 3 miles 01 buried phone line along Forest Road N/A Winter 2001 T37N,R13W CE Decision 1 <br />Line (11) 559. JOHN REIDINGER pending <br />Ouest Overhead Install about 3 miles of phone line on an existing overhead power N/A T36N,R12W C~4 Scoping in <br /> Winter 2001 <br />line ~o the Caviness Mtn, electronic site sec 23.26.36 progress <br />Rico Volunteer Add radio repeater to U.S. West passive,reflector site on N/A Winter 2001 T40N.R11W, CE Analysis in <br />~ire Dept. (6) Expectation Mountain. JOHN REIDINGER see 34 progress <br />Mechanical Fuels Using mechanized equipment (hydromower machine). reduce Decision, T38N,R15W, Decision <br />Reduction density of Gambel oak at Trimble Point (200 acres) and N/A Approved for T39N.R17W. CE pending for <br />~&4) Narraqulnnep Point@O acres). TOM KELLY Trimble Point Narraguinnep <br />Summit Ridge Replace and move eXisting water pump station 34 feet east of N/A Winter 2001 T37N.R13W CE Scoping in <br />I Water District current location, JOHN REIDINGER I sec 31 progress <br />RANGE ~=Fall r ~"'" <br />Haycamp / Rio Update allotment management plans for two cattle allotments: T37.38N'~ AnalYSIS in <br />Lado Grazing North and South Haycamp. CLIFF STEWART 2000 2001 Rl1.12,13W progress <br />Analysis <br /> Allotment Management Plans for Bald Hill. Beaver Crossing, House -- -- <br />Boggy Draw I Creek, Koehn, Mavreeso. Nipple. Pease Point. & Oak Knolls Winter 2001 I Spring 2001 T37N-40N~ Analysis in <br />Project Allotments. MARK TUCKER R13-15W progress <br /> <br />:~ <br />--:> <br /> <br />~ <br /> <br />-, <br /> <br />=> <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.