Laserfiche WebLink
<br />002:'"'8 <br /> <br />CONTENTS (Continued) <br /> <br />See hon <br /> <br />" <br /> <br />52. Embankment settlement installations <br />53. Foundation settlement instC'lllations <br />54. Surface settlement points <br />55. Special foundation settlement apparatus <br />56. Special test pit at station 58+50 <br /> <br />. <br /> <br />CHAPTER V[j--SPECIAL TEST EMBANKMENT PROTECTlON <br /> <br />57, Genera! <br />58. Construction of test section <br />59. Soil-cement <br />60. Asphaltic concrete <br />61. Field control tests <br />62. Future studies <br />63, Costs <br /> <br />APPENDIXES <br /> <br />A. Geologic profile of core trench for Bonny Dam <br /> <br />B. Loading conditions and design criteria for Bonny Dam <br /> <br />C. Cost summary for Bonny Dam <br /> <br />D. Excavation costs <br /> <br />E. Mix design data <br /> <br />F. Summary of volumes of concrete placed <br /> <br />G. Cost of test installations <br /> <br />H. List of specification drawings for Bonny Dam and access road <br /> <br />r. References <br /> <br />1, <br /> <br />, <br /> <br />iii <br /> <br />Page <br /> <br />79 <br />80 <br />80 <br />83 <br />83 <br /> <br />85 <br />86 <br />89 <br />91 <br />95 <br />96 <br />97 <br /> <br />100 <br /> <br />] 02 <br /> <br />]04 <br /> <br />105 <br /> <br />106 <br /> <br />]07 <br /> <br />108 <br /> <br />109 <br /> <br />110 <br />