My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00293
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:37 PM
Creation date
10/11/2006 9:37:39 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.700
Description
Platte River Basin - River Basin General Publications - Republican General Publications
State
CO
Basin
South Platte
Water Division
1
Date
4/29/1954
Author
BOR
Title
Bonny Dam - Technical Record of Design and Construction
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONTENTS (Continued) <br /> <br />CHAPTER V--CONSTRUCTION <br /> <br />A, General <br /> <br />33. Diversion and care of the river <br />34. Excavation and unwatering <br />35. Consolidation of dam foundations <br />36, Embankment <br />(al Earth fill in embankment. zone I <br />(b} Sand and gravel fill in embankment, zone 2 <br />(c) Dumped fill in embankment, zone 3 <br />(d) Special compaction of earth fill in embankment <br />(e) Backfill <br />(f) Gravel blanket and riprap <br />(g) Topsoil for seeding <br />(h) Seeding <br />37. Drainage <br />38. Concrete structures <br /> <br />Page <br />39 '1 <br />39 <br />44 <br />45 <br />45 , <br />46 <br />46 <br />46 <br />48 <br />48 <br />48 <br />49 <br />51 <br />53 <br /> <br />Section <br /> <br />B. Concrete Production and Control <br /> <br />39. Materials <br />(a) General <br />(b) Sand <br />(c) Coarse aggregate <br />(d) Cement <br />(e) Air entrainment <br />(f) Reinforcement <br />40. Forms <br />41, Batching <br />42, Mixing and placing <br />43, Curing <br /> <br />57 <br />57 <br />58 <br />58 <br />61 <br />61 <br />62 <br />62 <br />63 <br />66 <br />66 <br /> <br />C. Miscellaneous <br /> <br />44. Metalwork and machinery <br />(a) Outlet valves <br />(b) Outlet conduit <br />(c) High-pressure gate <br />(d) Fixed-wheel sluiceway gate <br />(e) Other metalwork <br />(f) Ventilation system <br />45. Access road <br />46. Protective works <br />47. Construction equipment <br />48. Factors affecting contractor's progress <br /> <br />68 <br />68 <br />68 <br />68 <br />68 <br />69 <br />69 <br />70 <br />70 <br />70 <br />71 <br /> <br />I <br /> <br />CHAPTER VI--TEST INSTALLATIONS <br /> <br />49. Purpose of test installations <br /> <br />73 <br /> <br />. <br /> <br />A. lnstaUation of Test Apparatus <br /> <br />50. General <br />51. Piezometer apparatus <br /> <br />73 <br />73 <br /> <br />ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.