Laserfiche WebLink
<br /> <br />2-A <br /> <br />PACIFIC SOUTHWEST INTl!lR-AGENCY COM4ITTEE <br /> <br />ANNuAL FLOOD--The highest stage or the greatest discharge in a water <br />year. <br /> <br />ANNUAL FLOOD PEAK SERJES--A list of ail the annual peak flood discharges <br />known, arrenged either in order of magnitude or chronologically. <br /> <br />ANmJAL LCM-FLOW--The lowest flow occurring each year, usually the lowest <br />,average flow for periods of perhaps 3, 7, 15, 30, 60, 120, or 180 <br />consecutive days. Instantaneous ldw flow, unlike instantaneous peak <br />flow, is usually of little interest. Because of the ennual cycle of <br />runoff, the years of computation of low-flow periods are usually <br />offset fran the conventional water year by six months and start on <br />AprU 1 of the stated calendar year. <br /> <br />ANTECEDENT PRECIPITATION--Precipitation that occurred prior to the <br />particular event, condition, or time under consideration. Usually, <br />it applies to that prior precipitation which is still effective in <br />modifying infiltration or runoff. <br /> <br />APPLlED WATER (IRRIGATION)--water made available for crop use. It does <br />not include direct precipitation nor conveyance losses before reaching <br />the edge of the field. <br /> <br />APPLlED WATER RI!);l.UIREMI!lNT--The amount of water required to be delivered <br />to a farmer's head gate for a crop in a given period of time. It does <br />.not include direct precipitation. <br /> <br />APPROPRIATED PUBLIC LANDS--Original public danain lands which are covered <br />by entry, patent, certification, or other evidence of land disposal. <br />For certain purposes, public lands which are within a reservation, <br />which contain improvements constructed with the aid of Federal funds, <br />or which are covered by certain classes of leases are also considered <br />appropriated. ' <br /> <br />APPROPRIATIVE WATER RIGHT--The legal right, acquired by fulfilling <br />certain legal requirements, to take or divert water for beneficial <br />use. <br /> <br />ARABLE LANDS--Lands capable of being cultivated end suitable for the <br />production of crops. <br />The Bureau of RecJ.il.mat1on is required by law to use for arable <br />land, "Land which, in adequate units and when properly provided with <br />. the essential improvements of leveling, drainage, buildings, irrigation <br />, facilities and the like, will have'a productiVe capacity, under <br />sustained irrigation agriculture, sufficient to: meet all production <br />expenses, including a reasonable return on investment; repay <br />reasonable irrigation and improvement costs; and provide a satisfactory <br />level of living for the farm family." <br /> <br />,- <br />