My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00267
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:29 PM
Creation date
10/11/2006 9:36:51 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8542
Description
Conejos Division - Platoro
State
CO
Basin
Rio Grande
Water Division
3
Date
4/1/1981
Title
SAFETY OF DAMS - Standing Operating Procedures for Platoro Dam and Reservoir - San Luis Valley Project
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />u:> <br />::.i) <br />C,'\l <br />c.] <br />c.:. <br /> <br />" <br />~" <br /> <br />f. Make initial determination regarding the extent of effort <br /> <br />. <br />, <br />.J <br /> <br />and equipment required to contain the spill. <br /> <br />g. Notify the Chama Field Division and/or the UGBP office <br /> <br />and report above information. <br /> <br />h. The URGBP office will call regional office personnel, day <br /> <br /> <br />or night. The regional office personnel will then contact: <br /> <br />(1) Commissioner's Office; <br /> <br />(2) Division of O&M Technical Services, E&R Center; <br /> <br />(3) EPA; and <br /> <br />(4) Colorado Environmental Improvement Division. <br /> <br />i. Establish a communication point; recruit help to assist in <br /> <br />relaying messages and gathering information. <br /> <br />j. .Assess threat posed to public health and make appropriate <br /> <br />warnings: <br /> <br />(1) Municipal water system, and <br /> <br />(2) Law enforcement and fire protection. <br /> <br />k. Consider spill combat techniques (refer to Oil Pollution, <br /> <br />Chapter III, paragraph I). <br /> <br />1. Initiate cleanup, disposal, documentation, and cost recovery <br /> <br />.,.j <br /> <br />procedures as directed by URGBP office. <br /> <br />A-27 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.