Laserfiche WebLink
<br />(,0 <br />00 <br />C\l <br />01 <br />:--.-) <br />C_~) <br /> <br />5. FAILURE OF APPURTENANT STRUCTURES OR OPERATING EQUIPMENT <br /> <br /> <br />,..1 <br /> <br />a. Determine: <br /> <br />(1) Probable cause of failure, duration, and effects on <br /> <br />reservoir operation; <br /> <br />(2) Immediate assistance required from the URGBP office to <br /> <br />remedy the problem, including: <br /> <br />(a) Replacement parts, <br /> <br />(b) Type of manpower, and <br /> <br />(c) Repair equipment; <br /> <br />(3) Available temporary replacement or temporary alternatives; <br /> <br />and <br /> <br />(4) Other pertinent facts. <br /> <br />b. Contact the Chama Field Division and/or the URGBP office <br /> <br />for additional instructions. <br /> <br />6. NEW SPRINGS, SEEPS, OR BOGGY AREAS <br /> <br />In the event of the development of new springs, seeps, or boggy areas, <br /> <br />follow the procedures below: <br /> <br />a. Determine: <br /> <br />A-17 <br /> <br />- <br />