Laserfiche WebLink
<br />t;~ <br />i~i <br />(.,k <br />,,\, <br />'--.~) <br /> <br />;..,' <br /> <br />~tn;~">~' .' . <br /> <br />(3) Drains and seeps; <br /> <br />(4) Spillway structure; <br /> <br />(5) Outlet works control house, tunnel, and gate chamber; <br /> <br />(6) Visible reservoir and downstream areas for landslides; <br /> <br />and <br /> <br />(7) Other appurtenant structures. <br /> <br />- <br />e. Report findings to the Chama Field Division and/or the <br /> <br />URGBP office or any other personnel in the regional office or E&R Center <br /> <br />~ . - <br /> <br />reported to previously during the earthquake incident. <br /> <br />f. If no apparent damage has occurred to the dam, . embankments, <br /> <br />or appurtenant structures, a "No Damage" report must be made to the <br /> <br />., <br /> <br />URGBP office. <br /> <br />. g. Continue to inspect and monitor the facilities for at least <br /> <br />.-,' <br /> <br />48 hours or as instructed by the URGBP office in event unobservable or <br /> <br />delayed damage occurs. <br /> <br />/" <br /> <br />h. Some damage to structures may not be readily apparent during <br /> <br />an inspection immediately following an earthquake. It is possible that <br /> <br />settlement of structures, the reactivation of old slides, or the develop- <br /> <br />ment of new slides may not occur with ground shaking and would manifest <br /> <br />itself after the initial inspection. A second inspection should be made <br /> <br />......". <br /> <br />'j~ <br /> <br />2 weeks to a month after the initial inspection. <br /> <br />'i <br /> <br />A-ll <br /> <br />.' <br />" <br /> <br />,,,,,,., <br /> <br />- <br />