My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00267
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:29 PM
Creation date
10/11/2006 9:36:51 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8542
Description
Conejos Division - Platoro
State
CO
Basin
Rio Grande
Water Division
3
Date
4/1/1981
Title
SAFETY OF DAMS - Standing Operating Procedures for Platoro Dam and Reservoir - San Luis Valley Project
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />t.... <br />N <br />C'J <br /> <br />1--._1 <br /> <br />A. GENERAL <br /> <br />I <br /> <br />This Emergency Preparedness Plan (EPP) has been prepared to aid the <br /> <br />c..) Reservoir Superintendent during an emergency situation or unusual <br /> <br />occurrence in immediate actions to take, who to notify, and what deci- <br /> <br />sions to make in event of loss of communications. An unusual occurrence <br /> <br />is defined as an event which takes place or a condition which develops <br /> <br />which is NOT NORMALLY ENCOUNTERED in the ROUTINE OPERATION of the dam <br /> <br />and reservoir and which MAY ENDANGER THE DAM or NECESSITATES either a <br /> <br />temporary or permanent REVISION of the OPERATING PROCEDURES. <br /> <br />The Dam Tender shall IMMEDIATELY REPORT the occurrence of unusual <br /> <br />conditions to the Chief, Chama Field Division, and the Projects <br /> <br />Superintendent by radio. The Projects Superintendent will notify <br /> <br />the Water Management Branch, regional office, by telephone. Depending <br /> <br />upon the nature of the development and the apparent urgency, the' <br /> <br />regional office shall notify the E&R Center and/or the Commissioner's <br /> <br />office. <br /> <br />All reporting officials shall maintain a diary (tape recordings, if <br /> <br />possible) on the preliminary form "Record of Telephone Report of Emer- <br /> <br />gency or Unusual Conditions and Facility Failures." <br /> <br />In general, initial reports should briefly include the following <br /> <br />information and should be documented on the "Record of Telephone Report." <br /> <br />A-S <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.