My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00267
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:29 PM
Creation date
10/11/2006 9:36:51 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8542
Description
Conejos Division - Platoro
State
CO
Basin
Rio Grande
Water Division
3
Date
4/1/1981
Title
SAFETY OF DAMS - Standing Operating Procedures for Platoro Dam and Reservoir - San Luis Valley Project
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, . <br />.~ <br />"i'- <br /> <br />"J <br />C'J <br /> <br />"1.._") <br />t._ .' <br /> <br />SUMMARY SHEET <br /> <br />I <br /> <br />Emergency Preparedness Plan (EPP) <br /> <br />For Platoro Dam <br /> <br />The Dam Tender and operators at Platoro Dam must be knowledgeable in <br /> <br />recognizing an emergency situation or unusual condition and must act <br /> <br />immediately to minimize danger to the structure and to all persons <br /> <br />within the immediate area, especially in the downstream channel. <br /> <br />As a minimum procedure, the Dam Tender shall immediately: <br /> <br />(1) Identify the emergency situation; <br /> <br />(2) Uake a decision to first contact either the: <br /> <br />(a) Chama Field Division, <br /> <br />(b) Upper Rio Grande Basin Projects (URGBP) office, or <br /> <br />(c) Conejos County.Sheriff; <br /> <br />(3) Determine actions to take with Projects Superintendent's <br /> <br />assistance; <br /> <br />(4) Follow instructions; and <br /> <br />(5) Uaintain contact with Chama Field Division office and <br /> <br />Upper Rio Grande Basin Projects office (if necessary, enlist help to <br /> <br />remain at communications source or to relay information). <br /> <br />A-2 <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.