|
<br />i''':. ~ {"'a
<br />~J" Q.
<br />
<br />ApPENDIX No. 1
<br />
<br />ALLOCAl'ION OF HOOVER DAM ENERGY UNDER REGULATIONS OF MAY 20, 1941.
<br />
<br />Allottee
<br />
<br />Arizona_____ _______ _ _ _ _ ______. _ _ _ _~__
<br />Nevada______ _ _ _ _. _ _____ __ _ _ _ ____ _ _..
<br />
<br />Metropolitan Water District_ _ _ _ ___ ____
<br />
<br />Los AngelcL____
<br />
<br />Pasadena_________ ____~_____________
<br />Glendale______.________ _____________
<br />Burhank______________ _________
<br />Southern California Edison Co., Ltd.____
<br />
<br />California Electric Power Co. (formerly
<br />Ne\'ada-California Electric Corp., pre-
<br />viously Southern Sierras Power Co.)
<br />
<br />Firm energy (4,330,00J,00J kilowatt-hours per year, diminishing I
<br />8,760,000 kilowatt-hours per year)
<br />
<br />Minimum which UnIted
<br />States must supply
<br />(percentage)
<br />
<br />17,6259,....___"... '
<br />17,6259_____,.._,____
<br />(To each State for
<br />use in the State ani}".)
<br />
<br />35 2517____" ,,____
<br />(For pumping Colo-
<br />rado Ri,'er water into
<br />and in its aqueduct.)
<br />
<br />17.555.L______
<br />
<br />I, 58H_ ___...... ___,
<br />1,8475____....____.
<br />,5773....___..,....
<br />7 0503. ___.. _ . ., ____
<br />
<br />Allottee's obligation if
<br />.energy is a\'ailable
<br />(percentage)
<br />
<br />None_ ___________ _ __~
<br />None________________
<br />(Each State has the
<br />option to take and re-
<br />linquish energy on
<br />specified notice.)
<br />
<br />35,2517...... .
<br />
<br />_ 36.9...3Y__~___________
<br />(Its own minimum,
<br />plus 55 percent of
<br />unused State alloca-
<br />tion, 35.2518 per-
<br />cent.)
<br />
<br />1.58H.. ..____ ...
<br />1,8475___..,.. ..u..
<br />
<br />2i:l~:~::::::::::::::
<br />
<br />(Its own minimum,
<br />plus 4-0 percent of
<br />unused State alloca-
<br />tion, 35.2518 per-
<br />cent.)
<br />
<br />2,6439_____".,,____
<br />(Its own minimum,
<br />plus 5 percent of un-
<br />used State allocation,
<br />35.251& percent.)
<br />TotaL_____ _ _ _ ______ _ _ _ _____ __ HXJ.oo__._ ___ _ _ _. _ ____ 100.00_. __
<br />
<br />,8813.."
<br />
<br />~faximum which allottee
<br />mOl\" demand under \'ar-
<br />. ious conditions
<br />(percentage)
<br />
<br />21,5428..,..........
<br />21.5428_______ ______
<br />(To each State its
<br />own allocation plus
<br />3.9169 percern not
<br />taken bv the other
<br />State p;ior to Apr.
<br />26, 1950; the total
<br />[clr both States !\\.>t
<br />to exceed J5.2518
<br />percent.)
<br />
<br />70,5035....___,... m
<br />(Its own minimum,
<br />plus first call on un-
<br />useJ energy allotted
<br />to States.)
<br />
<br />36,9439..........____
<br />(Its own minimum,
<br />plus 55 percent of
<br />unused State alloca-
<br />tion, J5.2518 per-
<br />cent.)
<br />
<br />1.5847___.,.._....
<br />1,8475_.,......____,
<br />.577L______ ______
<br />2115\0___...._...,
<br />(Its own minimum,
<br />plus 40 percent of
<br />unused State alloca-
<br />tion, 35.2518 per-
<br />cent.)
<br />
<br />],6439..,________,_
<br />(Its own minimulll,
<br />plus 5 percent of un-
<br />used State allocation,
<br />35.2518 percent.)
<br />
<br />. Allocated pcrc~nta,cll]ightly revilcd from thOle of 1930 regul~tionl, u dam h~ight wu incrca5~d in th~ dClign. and Los
<br />An,~]~..as allocu~c1 th~ toral incrC'uc in ~'limu~d ~nergy, 90 million k.h/yr.
<br />
<br />21
<br />
<br />Secondary energy
<br />(percentage)
<br />
<br />None.
<br />None.
<br />
<br />First call on all second-
<br />aryenergy.
<br />
<br />55 percent, subject to
<br />Jistrict's first call.
<br />
<br />None.
<br />None.
<br />None.
<br />40 percent, subject to
<br />district's first call.
<br />
<br />5 percent, subject to
<br />district's first call.
<br />
<br />100,00
<br />
|