My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00246
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:09:35 AM
Creation date
10/11/2006 9:36:24 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
6/27/1966
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />o ill L .) 7 <br /> <br />REPORT BY THE BUREAU OF RECLAMATION, REGION 4, <br />TO THE COLORADO WATER CONSERVATION BOARD <br /> <br />June 27, 1966 <br /> <br />Construction activity at GLEN CANYON DAM is centered on completion <br /> <br />work in the powerplant and switchyard, installation of the left diversion <br /> <br />tunnel plug and spillway elbow, and erection of the visitor center over- <br /> <br />looking the dam and reservoir. <br /> <br />On the CURECANTI UNIT, Blue Mesa Dam is substantial~ completed, and <br /> <br />work is proceeding on the completion contract for the powerplant and <br /> <br />switchyard. <br /> <br />Construction nears the halfway mark on Morrow Point Dam and Power- <br /> <br />plant. As of June 23, 1966, about 135,000 cubic yards of concrete had <br /> <br />been placed in Morrow Point Dam. The highest blocks in the dam were <br /> <br />about 216,5 feet above lowest point in the dam foundation on that date. <br /> <br />Rough excavation has been completed for the underground powerplant cham- <br /> <br />ber, and concrete placement in the powerplant has been started. <br /> <br />Satisfactory progress is noted on all features of the SILT PROJECT. <br /> <br />At Rifle Gap Dam Northwestern Engineering Company began diversion of <br /> <br />Rifle Creek through the outlet works on June 23. Embankment placement <br /> <br />has been initiated on the right abutment, <br /> <br />Grouting of the foundation is virtual~ complete, The concrete <br /> <br />work has been progressing well--the spillway slab placement is practi- <br /> <br />cal~ to the crest. June earnings will exceed earlier estimates with <br /> <br />the dam now being 68 percent complete. It appears that the dam and road <br /> <br />relocation work will be completed on schedule--ear~ in 1967. <br />
The URL can be used to link to this page
Your browser does not support the video tag.