Laserfiche WebLink
<br />24 <br /> <br />Results of Studies <br /> <br />Estimates of Cost of <br />Reservoir Construction <br /> <br />A summary of the estimates of the cost of providing vari- <br />ous increments of regulating and holdover capacity are indicated <br />in the following tabulations: <br /> <br />ESTIMATED COST OF CONSTRUCTING <br />DILLON RESERVOIR TO VARIOUS CAPACITIES <br /> <br /> ELEVATIONS Height <br />(ft. above meon sea level) Dam <br /> above CAPACITY ESTIMATED <br /> Dam Normal river bed (acre-feet) COST <br /> Cre~t H, W, S, (feet) Gross Net (dollars) <br /> 8900 8886 100 27,300 18,200 12,500,000 <br /> 8911 8897 III 37,000 27,900 13,300,000 <br /> 8934 8920 134 62,100 53,000 15,300,000 <br /> 8950 8936 150 83,200 74,100 16,700,000 <br /> SINGLE STAGE CONSTRUCTION <br /> 9031 9017 231 261,100 252,000 24,800,000 <br /> TWO STAGE CONSTRUCTION <br /> 9031 9017 231 261,100 252,000 25,800,000 <br /> Dead Storage Elevation 8856, Capacity 9100 Acre-Feet <br /> All estimates based on preparation and construction of foundation <br /> that would be required for the full-size reservoir. <br /> <br />ESTIMATED COST OF CONSTRUCTING <br />TWO FORKS RESERVOIR TO VARIOUS CAPACITIES <br /> <br />ELEVATIONS Height <br />(feet above mean sea level) Dam <br /> above CAPACITY ESTIMATED <br />Dam Normal river bed (acre-feet) COST <br />Crest H, W,S, (feet) Gross Net (dollars)'" <br />6425 6418 425 465,000 455,000 36,000,000 <br />6465 6458 465 610,000 600,000 40,000,000 <br />6540 6533 540 1,060,000 1,050,000 62,100,000 <br /> <br />"Items of Cost include Dam, Roads, Contingencies, Engineering, <br />Rights-of-Way, and Clearing. <br />