My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00183
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:07 PM
Creation date
10/11/2006 9:34:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600
Description
Colorado River Basin Salinity Control - Federal Agency Reports - USDA
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1991
Title
Colorado SCS Salinity Projects - Part 2 of 3 - Lower Gunnison Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-.. <br /> <br />o <br />N <br />''''';u.U1 <br />.'."!<,:,. <br />1~:l,; <br /> <br />B. EI igible Practices and Cost-Share Levels <br /> <br />1. On-Farm Salt Load Reduction: ISRP-i) <br />share ISee attachment #2 for components <br />effective lifespan.) <br /> <br />1/ <br /> <br />- 70% cost <br />and <br /> <br />2. Off-Farm Salt Load Reduction: ISRP~2) - 70% <br />cost share (See attachment #2 for components and <br />effective lifespan.) <br /> <br />3. Permanent Wi Idl ife Habitat: (SRP-3) - 70% cost <br />share (See attachment #2 for components and <br />effective lifespan.) <br /> <br />4. Shallow Water At-eas For Wi Idl ife:ISRP-4) - 70% <br />cost $hare ISee attachment #2 for components and <br />effective lifespan.) <br /> <br />1/ See attached Cost-Share Docket for more specific information <br />on Cost-Shareing. <br /> <br />III. Implementation Activities <br /> <br />A. Technical Assistance <br /> <br />;~~; <br /> <br />1. On farm planning and implementation began in <br />allocation of $99,000 in Technical Assistance funds. <br /> <br />FY 1991 with an <br /> <br />B. Cost-Share Assistance <br /> <br />1. F'i,-st year funding fo'- contracts, total ing $300,000 was <br />received in FY-91. <br /> <br />2. At the present time several projected contracts are foreseen <br />needing State Committee or DASCO approval. The projects ~nd needs wi I I be <br />identified in future PIP and construction updates. <br /> <br />3. To faci I itate the attainment of wi Idl ife habitat to replace <br />p,-c,Jected values f(orgone, due to futu,-e sal inity practice appl ication, an <br />accelerated appl ication program is needed to take advantage of situations <br />that are presenting themselves at this time. "Appl ications for wi Idl ife <br />habitat practices, exclusively, that are not within the Priority Area but <br />within the Sal inity Program Area wi I I be considered for contract <br />devel.:.pment." A wi Idl ife Biologist has been added to the F.O. Staff tc. <br />assist irl wi Idl ife habitat planning, ir,vento,-ies arId adherence to NEPA arId <br />SCS wetland pol icies. <br /> <br />.:::.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.