My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00183
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:07 PM
Creation date
10/11/2006 9:34:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600
Description
Colorado River Basin Salinity Control - Federal Agency Reports - USDA
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1991
Title
Colorado SCS Salinity Projects - Part 2 of 3 - Lower Gunnison Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LOWER GUNNISON #2-DELTA COUNTY <br /> <br />~f~-~~ <br /> <br />o <br />N <br />IJl <br />~ <br /> <br />PROJECT IMPLEMENTATION PLAN <br /> <br />I. Objectives <br /> <br />A. To reduce deep percolation from irrigat~d fields by 14,000 acre- <br />feet, seepage from on-'arm earthen ditches by 10,000 acre-'eet and seepage <br />from o"-'arm jarthen laterals by 2,500 acre-feet. These are annual <br />t-educ t i on goa Is. <br /> <br />B. To reduce on-farm/of'-farm salt loading by 104,700 tons/year <br />(94,230 tons On-Fann & 10,470,to:.ns Of'-Farm) by the end ,0' the projected 20 <br />year appl ication 0' the program. <br /> <br />C. To minimize adverse effect of sal inity control practices on wetland <br />and wi Idl ire habitat by identifyin:~ oppot-tunities that wi II replace <br />wi Idl ife values fe't-gone. <br /> <br />II. PLANNING ACTIVITIES <br /> <br />A. On-farm and Off-farm <br /> <br />0r~1~ <br /> <br />teota I <br />It is <br /> <br />1. Thet-e has been one sign-up pet- i cod feor De I ta Ce.unty #2. A <br />of 101 appl ications fcor Salt Reducticon Plans have been received. <br />neot expected that any contt-acts wi II be implemer,ted durir,g FY-91. <br /> <br />2. Planning activities are proceeding according to the <br />establ ished priot-ity system. It is estimated the fit-st ceontt-act wi II be <br />signed in May 1991 and appt-oximately 7 ccontt-acts wi II be signed allocating <br />the entire $300,000.00 designated for Area #2. <br /> <br />3. No off-farm activity within BOR responsibflity unti I further <br />detenninatieon by BOR. O'f-fann needs outside BOR t-espconsibi I ity wi II be <br />cons i dered fot- app I i cat i On. <br /> <br />4. Three part conservation treatment plans wi I I be developed; <br />improved management, structural practices, and wi Idl ife development. <br />Management includes IWM and cconservation cropping systems. Structural <br />practices wi II inc lude practices I isted on National Practice List for <br />Coloradco River Sal inity Prcogram. <br /> <br />1. <br /> <br />j~:;~i <br />
The URL can be used to link to this page
Your browser does not support the video tag.