My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00183
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:07 PM
Creation date
10/11/2006 9:34:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600
Description
Colorado River Basin Salinity Control - Federal Agency Reports - USDA
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1991
Title
Colorado SCS Salinity Projects - Part 2 of 3 - Lower Gunnison Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~""~ <br />$:~". <br />"'~~'-". <br />"',*~-. <br /> <br />0, <br />tv <br />W <br />~ <br /> <br />6. The Uncompahgre Valley Water Users in conjunction with the BOR <br />have started their livestock winter water replacement project. <br />They are about half done. within 3 years they plan to begin to <br />do some canal lining in this priority area. No coordinations at <br />this time are required. <br /> <br />7. Two plans are currently being developed that will require <br />DASCO approval. They will exceed the $100,000 on farm <br />limitation. <br /> <br />B. Eligible Practices and Cost-Share Levels (1) <br />1. On-Farm Salt Load Reduction: (SRP-1) - 70% cost share (See <br />attachment #2 for components and effective lifespan.) <br /> <br />2. Off-Farm Salt Load Reduction: (SRP-2) - 70% cost share (See <br />attachment #2 for components and effective lifespan.) <br /> <br />3. Permanent wildlife Habitat: (SRP-3) - 70% cost share (See <br />attachment #2 for components and effective lifespan.) <br /> <br />4. Shallow Water Areas For Wildlife: (SRP-4) - 70% cost share (See <br />attachment #2 for components and effective lifespan.) <br /> <br />III. IMPLEMENTATION ACTIVITIES <br /> <br />f1i;f <br /> <br />A. Technical Assistance <br />1. On farm planning and limited implementation began in FY 1991 <br />with an allocation of $99,000 in, technical assistance funds. <br />CUrrent planning staff is adequate to accomplish the obligation <br />of 1992 expected contract funds. Technician disciplines will be <br />needed to complete application activities in a timely manner. <br /> <br />B. Cost-Share Assistance <br />1. First year funding <br />received in FY 1991. <br />for modifications. <br /> <br />for contracts, totaling $600,000, was <br />This funded 13 contracts, keeping $60,000 <br /> <br />2. During FY 1991 there <br />contract for $134,000. <br />1992. <br /> <br />was 1 DASCO approved on farm salinity <br />There is a possibility of 2 during FY <br /> <br />3. If accelerated application of wildlife and wetland values <br />foregone is required there are currently three entities outside <br />of the priority area, but witnin the Lower Gunnison Salinity <br />Project area, that could be considered for contracts that would <br />mitigate wetland and wildlife values. <br /> <br />/;~:f.~! <br /> <br />(1) Please see the attached cost share docket for more specific <br />information on cost sharing. <br /> <br />~-'-~' . <br /> <br />'.-V~.t:. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.