Laserfiche WebLink
<br />~ <br />~ <br />~ <br />CJ <br /> <br />operation of Painted ~ock Dam. The feasibility study was com- <br />pleted in June 1980 as required under the Act. The report stated <br />that the plant would have about 46,000 acre-feet of reject water <br />which includes plant backwash, etc. and the necessary bypass of <br />excess drainage flows. The land acquisition at Painted Rock Dam <br />would help store excess flood waters of the Gila River for con- <br />trolled release to reduce the liklihood of increasing the <br />District's return flow. <br /> <br />I <br />, I <br />I <br /> <br />DL/gI <br /> <br />4 <br />