Laserfiche WebLink
<br />.) <br /> <br />.Y <br /> <br />thorough analysis of reservoir operations and dam stability <br />and safety, and, therefore, on November 10, 1976 the USSR <br />authorized the USGS to conduct such a study. <br />(7) That no special studies exist suggesting <br />solutions to the soil leaching problems as a result of the <br />Narrows Dam. <br /> <br />(8) That although the Bureau and the State <br />of Colorado propose to select an independent panel to review <br />the stability of the proposed Narrows Darn, they have not yet <br />authorized and directed any private or governmental agency <br />to conduct any studies to insure the safety of the Harrows <br />Darn structure. <br /> <br />(9) That no studies exist concerning construction <br />of a dike below .Bijou No. 2 Reservoir. <br />(10) 'the latest report by the Bureau of f<lines <br />(January 12, 1976) indicates the possibility that oil and/or <br />gas of economic importance ma.y exist in the geologic formation <br />in the Narrows Project area. There are no recent studies on <br /> <br />expected loss of revenue that would result from project <br /> <br />construction. <br /> <br />(11) That there have been no studies dealing <br />with the possible fugitive dust problems associated with the <br />Narrows Dam either during the construction phase or during <br />"the operation phase. <br />(12) That the Bureau has conducted no studies <br />concerning ~he expected flood carrying capacity of the South <br />Platte River below Narrows after completion of the Project. <br />(13) Consideration of the development of <br />groundwater as an alternative to Narrows was limited to a <br />review of documents published between 1972 and 1975, none of <br />which contain economic data or analysis. <br />(14) That no cost estimates exist concerning <br /> <br />the proposed earth shaping needed for boat launch ram~s in <br /> <br />-g - <br />