Laserfiche WebLink
<br />COACHELLA CANAL LINING <br />PROJECT <br /> <br />l'-.:J <br />C'-.. <br />)0" <br />c-, <br /> <br />. Preferred alternative: Construct lined canal in existing <br />cross section while bypassing water <br />. About 30,000 AF /YR conserved <br />· $54.7 million construction cost <br />. Increase in annual operation and maintenance costs <br />under investigation <br />. Release Draft EIS/EIR for public review in March 1993 <br />. Construction schedule: September 1994 to July 1996 <br />