Laserfiche WebLink
<br />ALL AMERICAN CANAL LINING <br />PROJECT <br /> <br />l'U <br />( ~ <br />jo>-' <br />-J <br /> <br />· Preferred alternative: Parallel lined canal from Pilot Knob <br />to Drop 3 <br />· 67,700 AF /YR conserved <br />· $86.1 million construction cost <br />· $14,000 increase in annual operation and maintenance costs <br />· Basis for decision: Less costly and time consuming, less <br />seepage and evaporation from narrower channel, <br />conventional construction methods utilized, uninterrupted <br />water service for 110 and CVWD, availability of earthen <br />conveyance channel for emergencies <br />· File final EIS/EIR in August 1993 <br />· Metropolitan hoping to become contractor <br />. Construction schedule: March 1995 to June 1997 <br />