My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00049
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:12:32 PM
Creation date
10/11/2006 9:29:55 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8281
Description
Colorado River Studies and Investigations
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1979
Title
Glen Canyon Dam - Power Plant - Expansion
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />c', <br />N <br />Q:l <br />.... <br />W <br /> <br />identified at this stage of the study so that the appropriate data <br /> <br />can be collected. Preliminary studies have revealed that the follow- <br /> <br />ing areas may be impacted, these are: sport fishing above Lee's <br /> <br />c <br /> <br />Ferry, endangered speci.es, ri.ver rafting above and below Leets Ferry, <br /> <br />erosion of beaches, effect on vegetation on beaches, and effect on <br /> <br />camping beaches below Lee's Ferry. If it is felt that there are <br /> <br />other potential impacts not mentioned here, please express them at <br /> <br />the meeting or write them down and send in the attached envelope, <br /> <br />PARTICIPATION IN STUDY <br /> <br />Anyone who is interested in par'ticipating in the study is wel- <br /> <br />come and encouraged to do so. There are three levels of participation <br /> <br />available to people corresponding to each person's inLerest in the <br /> <br />study and the time they have available to donate to Lhe study. There <br /> <br />will be a public group which will be for pcoplc or organizations who <br /> <br />want to be informed about what is going on with the study and who <br /> <br />occassionally will have co~ents to contribute. The technical teams <br /> <br />are for people who have a specialized interest and who want to get <br /> <br />more deeply involved in the study. The Planning Team is for represen- <br /> <br />tatives of the technical teams to meet and coordinate activities of <br /> <br />the technical teams. The attached illustration will help to show <br /> <br />the relationship between the teams. The following description of <br /> <br />each team goes into more detail. <br /> <br />funning Team <br /> <br />The level Qf participation here will require the most effort. <br /> <br />Membership will be restricted to technical team representatives. <br /> <br />. <br /> <br />, <br /> <br />'> <br /> <br />" ';, . J.~,:5 <br />;~,,;.~'Jt <br />
The URL can be used to link to this page
Your browser does not support the video tag.