My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00039
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:12:29 PM
Creation date
10/11/2006 9:29:35 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8101
Description
Arkansas River Basin
State
CO
Basin
Arkansas
Water Division
2
Date
8/3/1941
Author
G F Lacey
Title
Report on the Administration of Water to the Arkansas River and Run of Water to the Colorado Canal through Exchange with Lake Meredith July 29-August 5 1941
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OOOC:24 <br />i' <br />,f <br /> <br />. <br /> <br />, <br /> <br />" <br /> <br />.' <br /> <br />f <br /> <br />'" <br /> <br />3 <br /> <br />Investigation of River Administration, Continued <br /> <br />fallen ",bout 240 s.f. by 6AI1, 8/3 since !JAIl 8/2 and there seems <br />to have been no inforlTlrJ.tion a.vnilnble that this hud tal:en place. <br /> <br />tIr. ilheeler's 6i'l1 8/2 telephone report to Hr. Beachs <br /> <br />1. No report from Nepesta <br /> <br />2. Hater at the Cutlin Dam droppings <br />6At. B/2 G, H. .72 <br />6P~1 8/2 G. H. .62 <br />6i1E 8/3 G.H. .54 <br /> <br />f1r. Beach uaked \Iheelor to lOOasure the ri var at the Catlin Jo.m <br />to determine the exaot amount there, and cull him when he had <br />finished. <br /> <br />tlr, Whee-leI' called J-Ir. Beach at l2H 8/3. After making request- <br />ed measurements. <br /> <br />1. Over Catlin Dam - G.H. .5h - 7l's.f. <br />2. Catlin in at ll'H 8/3 with 212 s.f. <br />3~ 447 s.f. at Nepestu at 6Pl1 8/2. <br />4. Nepesta station 6AN 8/3 G.H. 2.30 - 300 s.f. <br /> <br />It is my understandillj; <br />between 7s30 - 8Atl 8/3 <br />river. <br /> <br />that the Nepesta report was phoned in late <br />after Hr. llheeler hud gone out on the <br /> <br />Hr. Beach first received infonnution conoerning the - stage of the <br />ri~r at Nepesta for 6.1\11 8/:3, at 8/3. <br /> <br />Hr. Beach ordereii the Colo. Canal to cut rot 100 s.f. of Heredith <br />water at l2N 8/3. <br /> <br />lIr. llheeler oalled on the Catlin to out 50 s.f. out for the Rocky <br />Ford ditch. It is alleged that the Catlin Co. refused to comply <br />with this request because the Colo. Cunul, through the lieredith <br />exchange, VIas diverting -,later ,'lhich should have been mn.de avail- <br />able for the Catlin. 111'. Hheeler communic<'.ted this fact to I-Ir. <br />Beach and 11r. Beach advi sed Hr. Hheeler to allow the Catlin to <br />continue their :tlversion without cutting out the 50 s.f. <br /> <br />I urderstand Mr, Uheeler personally cut the Catlin at lOl30PlI 8/4. <br />over the protest of the Catlin Company, to 43 s. f. to supply the <br />Rocky Ford. <br />
The URL can be used to link to this page
Your browser does not support the video tag.