Laserfiche WebLink
<br />000C.32 <br /> <br />> <br /> <br />~ <br /> <br />11 <br /> <br />Oxford Canal <br /> <br />At 2Ptl 8/5 too Amity was short of its 283 s. f. by a lar[!;or mar- <br />gin than the amount over 165 s.f. being diverted by the Ft. Lyon. <br />The next deoree in line to be out out to suppl:" the Amity is the <br />2/26/87 decree of too Oxford Canal. Te.k:ing the time elelOOnt into <br />consideration the Oxford I'j!l.S diverting water which the Amity was <br />eligible to reoeive, beginning at 3M 8/3. Too Oxford diverted <br />water which should have been Illllde available for the .Amity from <br />3MI 8/3 - 7PI1 8/4, at whioh time too Oxford began sluioing. <br /> <br />Overdiversion period - Oxford - 3Ml 8/3 - 7PI1 8/4. <br /> <br />Corresponding period <br />of Shortage - hIli ty 2PH 8/3 - 6?M 8/7. <br />