My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00031
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:12:27 PM
Creation date
10/11/2006 9:29:07 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.776
Description
Uncompahgre River General
State
CO
Basin
Gunnison
Water Division
4
Date
1/1/1972
Author
DOI-BLM
Title
Uncompahgre Project Colorado - Special Report on Need for Improvement and Extension
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />001191 <br /> <br />United Stales Department of the Interior <br /> <br />BUREAU OF RECLAMATION <br /> <br />GRAND JUNCTION PROJECTS OffICE -REGION 4 <br />P.O. BOX 1728 <br />GRAND JUNCTION. COLORADO 81S01 <br /> <br />IN REPLV <br />RHU TO: <br />500. <br /> <br />January 10, 1972 <br /> <br />MEMORANDUM <br /> <br />To: Regional Director, Region 4, Salt Lake City, Utab <br /> <br />From: Project Manager, Grand Junction, Colorado <br /> <br />Subject: Special Report on tbe need for Improvement and Extension-- <br />Uncompahgre Project, colorado <br /> <br />This report summarizes the results of reconnaissance investigations <br />concerning improvement and exteDdoD of the Uncompabgre Project to <br />meet current and anticipated needs of the area. Much of tbe infor- <br />mation contained in the report was supplied by the Uncompahgre Valley <br />Water Users Association, the contracting and operating entity for the <br />pro ject. <br /> <br />. The Uncompahgre Project is one of the oldest Fedaral Reclamation pro- <br />jects, having been autborized for construction in 1903. The original <br />project features, constructed mostly prior to 1915, included the <br />6-mile Gunnison Tunnel, 7 major diversion dams, and 565 miles of <br />canals and laterals. Later additions included tbe 106,200 acre- <br />foot Taylor Park Reservoir built during the 1935-1937 period and 215 <br />miles of land drains constructed frog 1936 to 1942. Needed rehabili- <br />tation work has been performed at intervals during tbe operational <br />period of the project. <br /> <br />Taylor Park Dam is in satisfactory operating condition and requires <br />only occasional minor maintenance. The initial one-balf of the <br />Gunnison Tunnel was constructed in sound metamorpbic rock, but tbe <br />remainder was constructed in shale and required concrete liDing for <br />stability. Tbroughout the history of the project, failure and <br />deterioration of the lining has required major periodic maintenance <br />and replacement. A current program of tunnel lining replacement <br />being performed by the Uncompahgre Valley Water Users Association <br />with Federal Rehabilitation and Betterment Funds is scheduled to <br />extend to June 1978. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.