Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />'0'01'209 <br /> <br />CHAPTER I <br /> <br />INTRODUCTION <br /> <br />including those irrigated prior to initiation of the project. Some of <br />the lands had essentially full water supplies developed prior to pro- <br />ject authorization through usage of Uncompahgre River water and the <br />owners of such lands did not desire to participate in the project <br />although their water was conveyed through canals and laterals acquired <br />by the project. Water carriage contracts were negotiated to provide <br />for delivery of water to the nonparticipating lands through the canal <br />systems acquired and reconstructed by the project. <br /> <br />In 1922, the project acreage was established at 129,942 acres, <br />consisting of 97,410 acres under cultivation or considered suitable <br />for cultivation and 32,532 acres considered economically unsuitable <br />for farming under conditions existing at that time. <br /> <br />By Act of Congress of May 25, 1926, the project irrigable acreage <br />was revised in accordance with recommendations of a Board of Survey <br />and Adjustments. The total project acreage was established at 128,770 <br />acres based on deducting 11,230 acres of nonproject lands fully irri- <br />gated under recognized prior water rights from the originally planned <br />140,000 acres. It was further established that, of the 128,770 acres, <br />25,357 acres were determined to be permanently unproductive and 27,629 <br />acres were temporarily unproductive. The project productive land <br />acreage was established at 75,784 acres. <br /> <br />The 1926 Act provided for future checking and modification of <br />the project acreage. By 1946, the acreage had been revised for various' <br />reasons to the totals summarized in the following tabulation. <br /> <br />Productive lands <br />Temporarily unproductive lands <br />Permanently unproductive lands <br />Total <br /> <br />75,353.5 acres <br />28,841.9 <br />23,366.4 <br />127,561.8 <br /> <br />During the period 1946 to 1948, the project land area was reclass- <br />ified at the request of the Uncompahgre Valley Water Users Association. <br />Results of the reclassification are summarized as follows: <br /> <br />Productive lands <br />Temporarily unproductive lands <br />Rights-of-way <br />Permanently unproductive lands <br />Total <br /> <br />62,927.2 <br />4,866.7 <br />3,034.5 <br />56,733.4 <br />127,561.8 <br /> <br />Construction Costs <br /> <br />The total project construction cost, exclusive of the cost of <br />the current Rehabilitation and Betterment Program, is $9,887,093. With <br />completion of the current R&B program, it is estimated that the project <br />construction cost will total $12,387,093. The total project cost is <br />$13,209,512, including $822,419 of past costs not directly related to <br />construction. A breakdown of the project cost is shown in the follow- <br />ing tabulation. <br /> <br />12 <br />