My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00027
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:12:25 PM
Creation date
10/11/2006 9:29:00 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/3/1984
Title
Monthly Progress Report - Aquatrain Project - March 1984
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />f'- <br /> <br />c., <br /> <br />A statistical error in calculations has been discovered <br />which will make it easier to meet Colorado River water quality <br />standards. Corrected calculations now show that 1.7 to <br />2.4 (rather than 2.1 to 2.8) milliQn tons of salt will have <br />to be removed from the river annually to meet standards <br />when Upper Basin depletions reach 5.8 million acre-feet ( <br />per year. <br /> <br />Reclamation is looking for beneficial uses for Big Sandy <br />River saline water as Chevron and Texas Gulf are not immediate <br />alternatives. <br /> <br />cJ <br /> <br />co <br /> <br />'-.4""- <br />'~-l <br /> <br />(...> <br /> <br />,.:.. <br /> <br />2.2 ANTICIPATED APRIL EVENTS <br /> <br />The House Subcommittee on Water and Power has scheduled <br />hearings on salinity control legislation (H.R. 2790) for <br />April 4. A markup of the Senate version (S.752) is being <br />sought by the Colorado River Basin Salinity Control Forum. <br /> <br />Clinton will meet with the Colorado River Basin Salinity <br />Control Forum Work Group on April 30 in Salt Lake City. <br /> <br />2.3. ANTICIPATED MAY EVENTS <br /> <br />Williams, Greenwood, Clark, and Clinton will attend the <br />May 1 meeting of the Colorado River Basin Salinity Control <br />Forum in Salt Lake City. <br /> <br />3.0 SUBTEAM: COAL MARKET/COAL SUPPLY (McKeever) <br />3.1 MARCH EVENTS <br /> <br />The Electric Power Development Corporation of Japan asked <br />the Iwatani Company to explore the possibility of building <br />two coal handling pipelines using CO2, Iwatani has developed <br />a process to obtain CO2 by stack gas scrubbing and could <br />use the CO2 to move imported coal from ships. <br /> <br />The Japanese Coal Development Corporation and 10 Japanese <br />utilities were briefed informally on AQUATRAIN. It appears <br />that a formal approach through U.S. diplomatic channels <br />will be needed to initiate action. <br /> <br />The briefing proposed by Secretary Clark for various 90vernment <br />departments on supply of coal to domestic and export markets <br />has been set for April 20. <br /> <br />3.2 ANTICIPATED APRIL EVENTS <br /> <br />On April 2, Ira McKeever will return to W. R. Grace & Co. <br />as his executive loan to Western Water Reserves, Inc., has <br />expired. Efforts to find a replacement have been initiated. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.