My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07634
CWCB
>
Water Supply Protection
>
Backfile
>
20000-20849
>
WSPC07634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:11:57 PM
Creation date
10/9/2006 6:34:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8507
Description
River Basin General Publications
State
CO
Basin
Rio Grande
Water Division
3
Date
4/18/1975
Title
USDA Detailed Work Outline - Rio Grande Type 4 Cooperative Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />- <br /> <br />~ <br /> <br />Kajar <br />Activi ty <br />Number <br /> <br />III <br />A2 <br /> <br />General Procedure <br />and Data Source <br /> <br />Analyze future econo- <br />mic and demographic <br />conditions. <br />Phase II, SCS, FS, <br />ERS interagency work <br />group. <br /> <br />e <br /> <br />USDA DETAILED WORK OUTLINE <br />RIO GRANDE TYPE 4 COOPERATIVE STUDY <br />April 1975 <br /> <br />Specific Procedures <br /> <br />SCS, FS, and ER$ WilL develop a linear programming <br />model with an objective of maximizing revenue sub- <br />ject to economic, social. and environmental con- <br />straints. Activities to be included: <br />a. Crop production <br />b. Forest and range management strategies. <br /> <br />land resource productivity units will be LeUs and <br />RUs within defined planning units. Restraints <br />included are: <br />a. Market shares for crop, livestock, and forestry <br />products. <br />b. Resource ava;labil ity~and suitabil ity for pro- <br />ducing products. <br />c. Environmental, social, and legal limitations. <br /> <br />:Purpose <br /> <br />:Who <br /> <br />Analyze current <br />and projected <br />resourc.e use & <br />provide informa- <br />tion for the <br />plan formulation <br />process. <br /> <br />:Start <br /> <br />Erd <br /> <br />10/75 <br /> <br />e <br /> <br />Status/ <br />Man-DaY5 <br />SCS: FS: EPS <br /> <br />60 <br /> <br />Underway <br /> <br />c1 <br />o <br />N <br />..... <br />f'> <br />~'" <br /> <br /> <br />100 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.