My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07516
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:11:24 PM
Creation date
10/9/2006 6:31:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/3000
Title
Jean Van Loan Contract-Exhibit A-Scope of Work Deliverables and Project Deadline
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I' <br /> <br />'. <br /> <br />./ <br /> <br />Exhibit A <br /> <br />Our intention is to hire Jean Van Loan as a contractor to perform the conversion of <br />DWR's Water Rights from dBASE into Informix. This memorandum explains in detail <br />the Scope of Work, the deliverables, and the deadline of this project. <br /> <br />There are 3 topics that will be covered in this.Seajle "f'N:u,k: Desired Results, Guidelines, <br />and Resources. <br /> <br />Desired Results <br /> <br />Jean will be tasked with converting the dBASE water rights records into the HydroBase <br />Design, for the West Slope Divisions ( Divisions 4, 5, 6, and 7). Then she will use these <br />data to produce3 tables of information that will be incorporated into the CRDSS <br />database. <br /> <br />Therefore the five deliverables for the CRDSS Project are: <br /> <br />1. Derived Net Amounts Table. <br />2. Derived Transactions Table. <br />3. Derived Augmentation Plan Table. <br />4. Routines to produce the Derived Tables. <br />5. Documentation <br />· Procedures manual - "how to load the database", and "how to load the derived <br />tables" . <br />· Developer's manual- "how the database conversion was performed", how the <br />derived tables were produced". <br /> <br />Jean Van Loan will submit the deliverables to DWR. DWR staffwill be responsible for <br />getting the data to the R Ti production database. <br /> <br />Since CRDSS relies on DWR's ability to provide these tables with current data, Jean must <br />also provide to DWR the ability to reproduce her work. <br /> <br />Therefore the seven deliverables to DWR are; <br /> <br />vI. Populated HydroBase Water Rights Tables. <br />L-2. dBASE to Informix Conversion Routines. <br />A. Derived Net Amounts Table. <br />/ <br />"4. Derived Transactions Table. <br />~5. Derived Augmentation Plan Table. <br />.6. Routines to produce the Derived Tables. <br />'7. Documentation. <br />· / Procedures manual- "how to load the database", and "how to load the derived <br />, <br />. tables". <br /> <br />0231 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.